首页> 外国专利> ENERGY MONITOR CONTROL PROCESS, ENERGY MONITOR CONTROL SYSTEM AND ENERGY MONITOR CONTROLLER

ENERGY MONITOR CONTROL PROCESS, ENERGY MONITOR CONTROL SYSTEM AND ENERGY MONITOR CONTROLLER

机译:能量监测控制过程,能量监测控制系统和能量监测控制器

摘要

PROBLEM TO BE SOLVED: To improve the accuracy of demand control for contract demand power in an energy monitor control process, energy monitor control, and energy monitor controller for performing measurement monitor and demand control for the power usage of a load such as electrical equipment installed at a plant or the like.;SOLUTION: A measuring function unit 3 measures the electrical energy consumption of a plurality of loads 7, 7, respectively, and a demand control function unit 2 predicts a used electrical energy amount upon the end of a time limit from the electrical energy consumption at predetermined time intervals from the start of the time limit and the respectively measured present electrical energy consumption of the plurality of loads. At least one of the plurality of the loads 7, 7 is controlled so that predicted electrical energy is within a predetermined contract value. By this constitution, a demand controller and a measuring apparatus are individually operated, and the demand controller predicts demand power from a tendency value of a measured pulse from WHM, thus solving problems such as low precision in demand control due to asynchronous operation in time between the prediction and load control.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:要解决的问题:在能源监控器控制过程中,为了提高合同需求电力的需求控制的准确性,需要使用能源监测器控制和能源监测器控制器对负载(例如已安装的电气设备)的用电量进行测量监测和需求控制解决方案:测量功能单元3分别测量多个负载7、7的电能消耗,需求控制功能单元2预测时间结束时的用电量从时间限制的开始以预定的时间间隔从电能消耗的最大限制,以及分别测量的多个负载的当前电能消耗。控制多个负载7、7中的至少一个,使得预测的电能在预定的收缩值之内。通过这种构造,需求控制器和测量设备被单独地操作,并且需求控制器根据来自WHM的测量脉冲的趋势值来预测需求功率,从而解决了诸如由于时间之间的异步操作而导致的需求控制的精度低的问题。预测和负载控制。;版权所有:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号