首页> 外国专利> To be laid out on the middle of the conveying path of suffering metrical

To be laid out on the middle of the conveying path of suffering metrical

机译:布置在苦难的传递路径的中间

摘要

PROBLEM TO BE SOLVED: To shorten the time required for balancing of weights and to improve treatment efficiency by providing the apparatus with at least a pair of supply feed rods for disengaging supply guide rails from the materials to be weighed after the arrival of the materials to be weighed at a position where the materials to be weighed transfer from these rails to a load bearing member. ;SOLUTION: Flowers and ornamental plants 77 are supplied by making their flow heads flush with each other onto a pair of the supply guide rails 16 at the upstream end of a supply conveyor 10 from a supply base 18. A pair of the supply feed rods 13 are moved together with follow-up weights 14 by the conveyor 10 and are engaged with the flowers and ornamental plants 77, by which the flowers and ornamental plants are transported. Cutting to a fixed length and dropping of leaves are executed during the course of the transportation. The supply guide rails 16 curve downward and the load bearing member 21 rises upward in the position when the supply guide rails 16 and the load bearing member 21 are brought in juxtaposition. Then, the flowers and ornamental plants 77 ride onto the load bearing member 21 in an about shockless state. At this time, the follow-up weights 14 turn backward from the progressing direction around the axes of the feed rods 13 and are disengaged from the flowers and ornamental plants 77, by which the flowers and ornamental plants 77 are transferred to the load bearing member 21. The shockless transfer and the rapid weight measurement are thus carried out.;COPYRIGHT: (C)1999,JPO
机译:解决的问题:为设备提供至少一对供料杆,以便在物料到达物料后将供料导轨与要称重的物料脱开,从而缩短重量平衡所需的时间并提高处理效率。在要称重的物料从这些轨道转移到承重构件的位置称重。 ;解决方案:通过使花朵和观赏植物的流头彼此齐平,将它们从供应底座18输送到位于供应输送机10上游端的一对供应导轨16上。传送带10将图13中的重物和随动重物14一起移动,并与花卉和观赏植物77接合,通过该花卉和观赏植物77运输花卉和观赏植物。在运输过程中将切成固定长度并放下叶子。当将供应导轨16和承载构件21并置时,供应导轨16向下弯曲,并且承载构件21向上升高。然后,花卉和观赏植物77以几乎无冲击的状态骑在承载构件21上。此时,随动重物14绕进给杆13的轴线从行进方向后退,并与花卉和观赏植物77脱离,从而使花卉和观赏植物77转移到承重构件上。 21.这样就进行了无震转移和快速称重。版权所有:(C)1999,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号