首页>
外国专利>
CHANGE ORDER PLAN AND MANAGEMENT METHOD OF ACHIEVEMENTS WHEN VESSEL IS CONSTRUCTED
CHANGE ORDER PLAN AND MANAGEMENT METHOD OF ACHIEVEMENTS WHEN VESSEL IS CONSTRUCTED
展开▼
机译:建造船舶时的变更计划和成就管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention was established, and more particularly, the ship in operating design, detailed design, product design, and while the constant production plan, small predetermined production planning relates to planning and performance management method according to at shipbuilding change orders, ship-owners and Yard (Yard) change orders (change order) of traceability and change production according to orders, designing a ship during the planning of the change order, so the variation of production costs due to change of plans can be thoroughly checked by and relate to performance management.; An object of the present invention, storing a history and cost information relating to the change order from the owner in the ship construction period and management, consultation, bulk change order by to proceed to consult with the owners about the respective change the order of the ship (Nego) is a planning and performance management process according to the available ship when changes to the order provides.; In addition, the planning and performance management offering bangbeopreul of the city to avoid the waste according to the agreement before pre-release of drawing changes depending on the demand for change orders from ship owners change orders.; The present invention to achieve the above object, the method comprising: if during ship owners are required to change the design to carry out technical review thereof to each department is assessed for change orders are assigned a unique code for the server computer and store ,; After review of whether the above-mentioned change orders to each department to calculate an estimate for the change order and ship owners and change order negotiation for a change order to the back to the server computer for the box and the addition untested consultation cases proceed to cancel and hold paperwork unique number and inputting to give,; And a step to give a unique number to change the order document separately for change order is negotiated during the consultation with the made to the owner stored in the server computer,; And release of drawing steps to make the change only for confirmation whether to check the estimate documentation for the registration as a change order change order change order documents and registering a document cases,; After the budget documentation and clear, shipbuilding complete the change, release of drawing gun according to log data and change orders on pending cases on change orders for the ship owner requirements for the vessels dry periods shipowners to the one comprehensive history management list consists of the steps of the bulk and the change order is characterized in that the consultation.
展开▼