首页> 外国专利> CHANGE ORDER PLAN AND MANAGEMENT METHOD OF ACHIEVEMENTS WHEN VESSEL IS CONSTRUCTED

CHANGE ORDER PLAN AND MANAGEMENT METHOD OF ACHIEVEMENTS WHEN VESSEL IS CONSTRUCTED

机译:建造船舶时的变更计划和成就管理方法

摘要

The present invention was established, and more particularly, the ship in operating design, detailed design, product design, and while the constant production plan, small predetermined production planning relates to planning and performance management method according to at shipbuilding change orders, ship-owners and Yard (Yard) change orders (change order) of traceability and change production according to orders, designing a ship during the planning of the change order, so the variation of production costs due to change of plans can be thoroughly checked by and relate to performance management.; An object of the present invention, storing a history and cost information relating to the change order from the owner in the ship construction period and management, consultation, bulk change order by to proceed to consult with the owners about the respective change the order of the ship (Nego) is a planning and performance management process according to the available ship when changes to the order provides.; In addition, the planning and performance management offering bangbeopreul of the city to avoid the waste according to the agreement before pre-release of drawing changes depending on the demand for change orders from ship owners change orders.; The present invention to achieve the above object, the method comprising: if during ship owners are required to change the design to carry out technical review thereof to each department is assessed for change orders are assigned a unique code for the server computer and store ,; After review of whether the above-mentioned change orders to each department to calculate an estimate for the change order and ship owners and change order negotiation for a change order to the back to the server computer for the box and the addition untested consultation cases proceed to cancel and hold paperwork unique number and inputting to give,; And a step to give a unique number to change the order document separately for change order is negotiated during the consultation with the made to the owner stored in the server computer,; And release of drawing steps to make the change only for confirmation whether to check the estimate documentation for the registration as a change order change order change order documents and registering a document cases,; After the budget documentation and clear, shipbuilding complete the change, release of drawing gun according to log data and change orders on pending cases on change orders for the ship owner requirements for the vessels dry periods shipowners to the one comprehensive history management list consists of the steps of the bulk and the change order is characterized in that the consultation.
机译:确立了本发明,更具体地说,是在船舶的操作设计,详细设计,产品设计上进行的,并且在恒定的生产计划的同时,小的预定生产计划与根据造船变更单,船东的计划和性能管理方法有关。和院子(Yard)的可追溯性变更单(change order),并根据订单变更生产,在变更单的计划期间设计船舶,因此可以通过计划变更彻底检查与变更相关的生产成本绩效管理。本发明的一个目的是,在造船期间存储来自船东的与变更单有关的历史和成本信息,并进行管理,咨询,批量变更单,以便与船东就船舶的各个变更单进行协商。船(Nego)是在订单变更时根据可用船进行计划和绩效管理的过程。此外,根据船东变更订单的需求,城市的规划和绩效管理提供的bangbeopreul可以根据协议避免浪费,从而在预发布图纸变更之前根据协议避免浪费。本发明为实现上述目的,该方法包括:如果在船东期间要求船东改变设计以对其进行技术审查,则对每个部门的变更单进行评估,为服务器计算机和商店分配唯一代码;在审查了上述更改单是否发送给每个部门以计算更改单和船东的估计费用以及更改单协商后,将更改单退回至服务器计算机的包装箱,然后再进行未经测试的咨询案例取消并保存文件的唯一编号并输入要给出的;在与服务器服务器上存储的所有者进行协商的过程中,协商给出唯一编号以分别更改订单文件以进行更改订单的步骤;并发布制图步骤,以仅进行变更确认,以确认是否将估计的评估文件作为变更单登记为变更单,变更单文件和案件登记单;在预算文件和清算文件中,造船厂完成了变更,根据日志数据释放了抽水枪,并针对船东要求的变更订单,针对船舶缺水期船东的变更订单,对未决案件的变更单进行了变更,由一份全面的历史管理清单组成批量和变更单的步骤的特征在于协商。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号