The invention thumb pile and jibogong of the installed lift the clearance of the check valve internal inlet to occur between the wale pack material files and the wale and stretching by providing the (RIFT PACK) in the gap and enforce the cement grouting method as construction the toryubyeok rigidly binding and so as to lift pack to fill the concrete pre-cast in the space portion of the H section steel in the wale of the H beams so that the foot hold the ring is installed to the lift pack so as to be securely fixed thereto buried strap to wale receiving the earth pressure of the side wall to provide a grouting method using the lift-pack in toryubyeok construction that allow smoothly pass the horizontal load of the file in the re-wale and stretching.; Grouting method using the lift-pack in toryubyeok construction according to the present invention comprises the steps of irradiating the gap size of the construction site of the construction target toryubyeok; Determining the type and specification of the lift pack for grouting, depending on the size of the survey niche; Installing determined grouting lift pack for grouting in the construction site and step making a loop in wale; Injecting a grouting material through the inlet check valve is built in the installed lift pack; After completion of the injection in accordance with a predetermined time grout material lift pack is sealed automatically by a check valve comprising: curing for a predetermined time; And it is configured to include the steps of: installing a pre-cast concrete to the space portion of the strip-shaped steel H artisan.; Thus, according as the present invention, the soil, and by using a constant magnitude lift pack manufactured to meet a wide range of field conditions, such as the gap size it underwent grouting, workability is simple, cost-effective and to maintain the structural stability there is an advantage in that.
机译:安装的本发明的拇指桩和基波公提升了止回阀内部入口的间隙,该间隙出现在纵行包装材料锉和纵行之间,并通过在间隙中设置(RIFT PACK)进行拉伸,并在施工时实施水泥灌浆方法。 toryubyeok牢固地捆扎,以便提升包装以填充H型钢纵行中H型钢空间部分中的混凝土预制件,以便将脚固定环安装到提升包装上,从而牢固固定在其上的埋入式扎带上,以承受侧壁的土压力,以在toryubyeok构造中使用提拉包提供一种灌浆方法,该方法可以使锉刀的水平载荷平稳地通过并在横行中拉伸。在根据本发明的toryubyeok施工中使用提升组件的注浆方法包括以下步骤:辐照施工目标toryubyeok的施工现场的间隙尺寸;根据勘测利基的大小,确定用于注浆的提升组件的类型和规格;在施工现场安装确定的灌浆升降机组件以进行灌浆,并逐步绕行绕行;通过进口止回阀注入灌浆材料已安装在已安装的提升装置中;在按照预定时间完成注射之后,灌浆物料提升组件通过止回阀自动密封,该止回阀包括:固化预定时间;并且其构造包括以下步骤:在带状钢H型工匠的空间部分中安装预制混凝土。因此,根据本发明,土壤和通过使用恒定大小的提升包装来制造,以满足各种现场条件,例如间隙大小,对土壤进行灌浆,可操作性简单,经济高效并保持结构稳定性方面有一个优势。

著录项

  • 公开/公告号KR100476838B1

    专利类型

  • 公开/公告日2005-03-17

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20020045906

  • 发明设计人 최정범;나경준;최춘식;천병식;

    申请日2002-08-02

  • 分类号E02D17/04;E02D5/18;

  • 国家 KR