首页>
外国专利>
The on-the-site structure joining polymeric fiber formed heat insulaing mat of open cells with supporting pins having perporated floors
The on-the-site structure joining polymeric fiber formed heat insulaing mat of open cells with supporting pins having perporated floors
展开▼
机译:现场结构将聚合物纤维与开孔地板的支撑销连接起来形成开孔的隔热垫
展开▼
页面导航
摘要
著录项
相似文献
摘要
The subject innovation is the first bonding moment is firmly fixed in this, the construction structure that location, at the same time the outer surface of the inner surface (P1) and a first stationary plate fine vent structure of the insulation part to be the wall is permanently bonded such as gypsum is disclosed a permanent adhesive force generated relates to (S) at the same time, the same adhesive is applied to the initial and permanent adhesive is the same adhesive to occur at the position of the plate-shaped molded polymer seomyuje vent structure the insulation and fixing members coupled by pressing it against the wall site construction structure on.; Construction site structure of the present design includes a plurality of through-holes of the plate-shaped polymer seomyuje breathable insulation structure (11) (H) is formed; The inner surface (S I) first fixed plate 12 of the plate in contact with the inner surface (P 1) of a heat insulating material 11 and; And extending upright in the center of the first fixed plate 12, a connecting shaft 13 which penetrates the through hole (H), and; Connecting the inner shaft is coupled detachably to the distal end of (13) (S I), the second stationary plate 14 of the plate in contact with the outer face (P 2) of a heat insulating material 11 and; Consists of adhesive applied to the outer surface (S O) of the inner surface (P 1) and the first fixed plate 12 of the heat insulator 11, the structure of the above is the step 100 for cutting the insulation (11) .; Step 200 to display the position fixing member coupled to the insulating material 11; The heating step of the puncture member 300 and; The step of boring a through-hole 400, and; Adhesive applying step 600, and; It is constructed via a bonding step 700. The; Construction site structure of the present design has the advantage that cost reduction is possible by up to ensure quality construction, shortening and downsizing the construction workability is excellent initial adhesion and persistent adhesion fixing initiation occurs at the same time with the same adhesive at the same position.
展开▼