首页>
外国专利>
While manner and the excavation body of the excavation body building being packed the drilling rig building and being packed and
While manner and the excavation body of the excavation body building being packed the drilling rig building and being packed and
展开▼
机译:挖掘体建筑物的方式和挖掘体被打包时,钻机建筑物被打包并
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To perform simple and rapid alignment during coupling of an excavation body piece with a running truck fixed by a method wherein the excavation body piece is conveyed to a driving position right below a drive part by a conveying truck and coupled to the drive part or the drive part and a driven excavation body piece. ;SOLUTION: An extension piece 6a2 is placed on a conveying truck 16 waiting in a temporary placing position B. A drive part 5 is then raised and the truck 16 is moved to a driving position B and coupled to the drive part 5. After the truck 16 is returned to a temporary placing position, the drive part 5 is lowered and the extension piece 6a2 is coupled to a driven piece 6a1 at a topmost stage. Consecutively, excavation operation is effected and a piece coupled body is lowered. Through repetition of the operation described above, an excavation body is driven down to a given depth in a ground simultaneously with assembly of an excavating body. This constitution simplifies and besides performs careful and accurate regulation of the position of the piece 6a2 by the truck 16.;COPYRIGHT: (C)1998,JPO
展开▼