首页> 外国专利> In order that manner and the device null job entry memory which optimize job flow plan

In order that manner and the device null job entry memory which optimize job flow plan

机译:以这种方式和设备将优化作业流程计划的作业条目存储为空

摘要

PROBLEM TO BE SOLVED: To provide a method and a device for optimizing a workflow schedule on the basis of target completion time.;SOLUTION: A difference, with which a task forming a workflow process is put into an inbox queue and estimate wait time(EWT) is subtracted from target task start time(TTST) of a work item or total sum of the EWT of the work item inside the queue and average work item processing time(AHT) of that work item based on a task station is subtracted from the TTST of this work item, is obtained, the difference as a result is divided with an advancing speed QAT for that queue to move between queue positions, and this value is calculated as rounded one. An optimizing function is applied to this queue, scaling with a work item to fail the satisfaction of target time is optimized and the order of work items in the queue is determined.;COPYRIGHT: (C)2001,JPO
机译:要解决的问题:提供一种基于目标完成时间优化工作流时间表的方法和设备;解决方案:区别在于将形成工作流过程的任务放入收件箱队列并估计等待时间(从工作项目的目标任务开始时间(TTST)或队列内工作项目的EWT的总和中减去EWT),并从任务站中减去该工作项目的平均工作项目处理时间(AHT)。获得该工作项的TTST,结果的差除以该队列在队列位置之间移动的前进速度QAT,并将该值计算为四舍五入。对该队列应用优化功能,对工作项进行缩放以使无法满足​​目标时间得到优化,并确定队列中工作项的顺序。;版权:(C)2001,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号