The present invention relates to a method for tunnel construction tunnel structures and tunnel structures formed structure,; Upwardly inclined in advance in the traveling direction so that the tunnel form of a circular or rectangular shape, such as a tunnel by the press-fitting installation stress material pipe of small diameter,; TO obtain a stable ground layer by external stresses due to the ground earth pressure is evenly transmitted to the stress material pipe to the reinforcing effect,; Ever built by the tunnel structure for a tunnel formed by a method of grouting to form a plurality of columns Chemical the tube on the upper side of the small-diameter pipe stress material in multiple stages by using a packer and then insert installed in a number of ways,; Giving to further reduce the disturbance such as your line registration inventors Patent No. 418 377 No. of all personnel, equipment and materials as well as tunnel excavation is to occur easily and more quickly than using is safe structurally, yet to further shorten the construction period It will put the object as to form a tunnel for the forming structure.; The present invention for achieving the above object is,; As in the ground terrain, such as mountain areas consisting punghwaamcheung mainly comprising alluvial soil or to the tunnel construction to form a tunnel structure which is used to strengthen the improved ground,; First nine jobs entrances of all materials and personnel as an advance base (outpost) the form in the finish the foundation and construction in the center of the planned linear to enforce tunnel status, obliquely upward to the tunnel proceed in the same direction as the tunnel the external stress by the circular or small-diameter stress material pipe 50 of a predetermined distance such that the rectangular shape of the ground earth pressure by installing the press is evenly transmitted to the stress material pipe 50 of small diameter stable ground by reinforcing functional layer and a stress step of forming a material pipe installation,; Drilling a plurality of holes (60a) on the upper side stress material pipe 50 of a small diameter provided so as to obtain a stable ground layer in response to the external stresses and, in the longitudinal direction with a plurality of one-way valve (100a) is composed of insert and the tube 100,; Or longitudinal direction is formed with a plurality of one-way valve (100a), the distal end is at the same time as drilling a plurality of holes (60a) using a drilling rig (not shown) the tube 100 is drilling bit (100a) formed integrally after insertion deep into the ground installation tube 100,; The tube 100 into the packer (packer) (110a) is inserted into the settable material injection rod 110 is provided at the front end packer (110a) is one to come to the tube 100 ends and then, slowly retracting the packer (110a) while the grouting process for out flow of grout settable material 200 into the tube 100 to the grout settable material the outer 200 via the one-way valve (100a) formed in the tube 100 to injection hayeoseo so injected into the soil, Chemical the soil characterized by construction method for forming a tunnel structure in the yirueojim it included.
机译:本发明涉及一种用于隧道施工的隧道结构及隧道结构成型结构的方法,沿行进方向预先向上倾斜,以使圆形或矩形的隧道形式,例如通过小直径的压配安装应力材料管的隧道;为了获得稳定的接地层,通过将由于地面压力引起的外部应力均匀地传递到应力材料管而起到增强作用;曾经通过隧道结构建造过的隧道是通过灌浆形成多根柱子的方法形成的,使用封隔器分多个阶段对小直径管道受力材料上侧的管进行化学处理,然后多次插入安装的方式;为了进一步减少干扰,例如您的线路注册发明人专利号418377,所有人员,设备和材料以及隧道的开挖比结构上安全的使用更容易,更快捷地进行,但进一步缩短了施工时间period将放置对象以形成成型结构的隧道。用于实现上述目的的本发明是:如在地面地形中,例如由主要由冲积土组成的punghwaamcheung组成的山区,或到隧道构造中形成隧道结构,用于加强改良的地面;所有材料和人员的前九个作业入口作为先行基础(前哨)的形式完成在计划线性中心的基础和施工,以增强隧道的状态,倾斜向上延伸至隧道的方向与隧道相同预定距离的圆形或小直径应力材料管50产生的外部应力,使得通过安装压力机而产生的矩形接地土压力通过加强功能层均匀地传递到小直径稳定接地的应力材料管50以及形成材料管装置的应力步骤;在小直径的上侧应力材料管50上钻多个孔(60a),该孔设置成响应于外应力而获得稳定的接地层,并在纵向上用多个单向阀( 100a)由插入件和管子100组成;或在纵向上形成有多个单向阀(100a),远端是同时使用钻机(未示出)在管100是钻头(100a)上钻多个孔(60a)的)在插入地面安装管100深处后整体形成;将管子100插入封隔器(封隔器)(110a)插入可凝结材料注入杆110,在封隔器(110a)的前端设置一个端部以到达管100的端部,然后缓慢地缩回封隔器(110a)在灌浆过程中,灌浆可固化材料200流入管100内,然后通过管100上形成的单向阀(100a)将灌浆可固化材料外层200注入土壤中,从而注入土壤,化学处理土壤其特征在于在其所包括的伊吕厄岛内形成隧道结构的施工方法。

著录项

  • 公开/公告号KR20050106615A

    专利类型

  • 公开/公告日2005-11-11

    原文格式PDF

  • 申请/专利权人 NTS ENGINEERING&CONSTRUCTION CO. LTD.;

    申请/专利号KR20040031597

  • 发明设计人 KIM JEONG YOON;

    申请日2004-05-06

  • 分类号E21D9/04;

  • 国家 KR

  • 入库时间 2022-08-21 21:28:10