首页>
外国专利>
CONTRACT WORK RESULT MANAGEMENT SYSTEM, CONTRACT WORK RESULT MANAGEMENT METHOD, CONTRACT WORK RESULT MANAGEMENT PROGRAM AND STORAGE MEDIUM
CONTRACT WORK RESULT MANAGEMENT SYSTEM, CONTRACT WORK RESULT MANAGEMENT METHOD, CONTRACT WORK RESULT MANAGEMENT PROGRAM AND STORAGE MEDIUM
展开▼
机译:合同工作结果管理系统,合同工作结果管理方法,合同工作结果管理程序和存储介质
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a contract work result management system having automatic payment function while saving system operation by automatically calculating a result amount based on an accurate result quantity and a result rate.;SOLUTION: A management center 25 includes a progress content approval means 2 confirming the progress content of a work transmitted from a work site 16 and giving approval thereto, a result quantity accumulation means 3 accumulating the result quantity of the approved work, a result rate calculation means 4 calculating a result rate based on the result quantity of the approved work, a site progress state picture management means 5 storing site pictures taken by a photographic means, an image display means 6 displaying images for confirming the work site state taken by a video camera, a three-dimensional map formation means 7 forming a three-dimensional view of at least the construction site 16 or a work site peripheral area three-dimensional view, and an accumulated data storage means 8 storing accumulated data in a predetermined period based on data of each means.;COPYRIGHT: (C)2007,JPO&INPIT
展开▼