首页> 外国专利> Method for erecting an at least two-piece main boom for a lattice-boom crane and lattice-boom crane built accordingly

Method for erecting an at least two-piece main boom for a lattice-boom crane and lattice-boom crane built accordingly

机译:构筑桁架臂起重机的至少两件式主起重臂的方法和相应构造的桁架臂起重机

摘要

The present invention substantially relates to a method for erecting and disassembling an at least two-piece main boom for a lattice-boom crane. The erecting and disassembling procedure results in that the geometric kinematic properties of the main boom (1, 2) are used in such a manner that during the erecting and disassembling, the effective lever arm (1′) of the main boom (1, 2) is reduced. This results from the main boom (1, 2) being bent at the hinge point (A), at which at least two boom portions (1, 2) are connected to each other, and thus an angle position is produced between the two boom portions (1, 2). Further, the invention relates to a main boom (1, 2), which can be erected by the method as well as a lattice-boom crane having such an main boom (1, 2).
机译:本发明主要涉及一种用于架设和拆卸用于格构臂起重机的至少两件式主起重臂的方法。架设和拆卸过程导致主吊臂( 1、2 )的几何运动特性的使用方式为,在架设和拆卸过程中,有效杠杆臂( 1主动臂( 1、2 )的'')减小了。这是由于主臂杆( 1、2 )在铰接点(A)处弯曲的缘故,在该铰接点处至少有两个臂杆部分( 1、2 )连接到彼此之间,因此在两个动臂部分( 1、2 )之间产生一个角度位置。此外,本发明涉及一种可以通过该方法竖立的主起重臂( 1、2 )以及具有这种主起重臂( 1、2 < / B>)。

著录项

  • 公开/公告号US7270243B2

    专利类型

  • 公开/公告日2007-09-18

    原文格式PDF

  • 申请/专利权人 STEFAN DIEHL;

    申请/专利号US20050233981

  • 发明设计人 STEFAN DIEHL;

    申请日2005-09-23

  • 分类号B66C23/42;

  • 国家 US

  • 入库时间 2022-08-21 21:03:11

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号