首页> 外国专利> Alignment method LOADS FOR GENERAL RESOURCES GROUP OF PRODUCING WELLS IN cyclic mode THEIR WORK AND DEVICE MANAGEMENT NETWORK

Alignment method LOADS FOR GENERAL RESOURCES GROUP OF PRODUCING WELLS IN cyclic mode THEIR WORK AND DEVICE MANAGEMENT NETWORK

机译:循环模式下生产井的通用资源组的对准方法载荷及其工作和设备管理网络

摘要

1.method u0432u044bu0440u0430u0432u043du0438u0432u0430u043du0438u00a0 loads available in a well u0433u043bu0443u0431u0438u043du043du043e - pumping equipment, u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0449u0435u043c u043fu0435u0440u0435u043au0430u0447u043au0443 fluid system with the ability u043du0435u0444u0442u0435u0441u0431u043eu0440u0430 pump still, his work in the endless cycle of extraction fluid, with the appointment of u043f1u043f2 pump pumping the primary time u043fu0440u043eu0441u0442u043eu00a0 t3 characterizing u0435u0441u0442u0435u0441u0442 large flow caused by the u043fu043bu0430u0441u0442u043eu0432u044bu043c pressurewhere p1 is the u043du043eu043cu0438u043du0430u043bu044cu043du0430u00a0 pump capacity; p2 is the discharge of fluid, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, equalization of loads u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 to common resources group dss u044bu0432u0430u044eu0449u0438u0445 wells, u0434u043bu00a0 working flow of wells u0438u0437u043cu0435u0440u00a0u044eu0442 actual current u0432u0440u0435u043cu00a0 u043fu0440u043eu0441u0442u043eu00a0 pif and counting the relative current u0432u0440u0435u043cu00a0 u043fu0440u043eu0441u0442u043eu00a0 as a share of the u0430u0434u0430u043du043du043eu0433u043e time u043fu0440u043eu0441u0442u043eu00a0 tp = pif / t3.u0440u0430u0441u043fu0440u0435u0434u0435u043bu00a0u044eu0442 and u0440u0430u043du0436u0438u0440u0443u044eu0442 descending current relative times u043fu0440u043eu0441u0442u043eu00a0 wells, set the maximum and minimum permissible current Mmax Mmin u0437u043du0430u0447u0435u043du0438u00a0 cleaner la working on pumping wells, u0438u0437u043cu0435u0440u00a0u044eu0442 working on at the moment of pumping wells mt, compare the number of employees at the pumping current scr u0430u0436u0438u043d mt borders u043fu043eu043bu00a0 clearance Mmin and Mmax,if mt Mmin include work on pumping well, u043au043eu0442u043eu0440u0430u00a0 matters most current relative time u043fu0440u043eu0441u0442u043eu00a0 provided mt = Mmax, prohibit conclusion in pumping wells, u043du0430u0445u043eu0434u00a0u0449u0438u0445u0441u00a0 mode u043fu0440u043eu0441u0442u043eu00a0 provided Mmin Mmax mt's ban on the work of several immobilized with pumping u043au0432u0430u0436u0438u043d in accordance with their "rank".so that the total number of employees and are allowed to be included in the work on pumping wells was still the top border clearance Mmax.;2. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the amount of time u043fu0440u043eu0441u0442u043eu00a0 t3 set on time u0437u0430u043fu043eu043bu043du0435u043du0438u00a0 u0437u0430u0442u0440u0443u0431u043du043eu0433u043e space in one cycle of the cyclical dir name of the production fluid.;3. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the maximum and minimum allowable u0437u043du0430u0447u0435u043du0438u00a0 Mmax Mmin number of simultaneously working wells set so that they u043eu0431u0440u0430u0437u043eu0432u044bu0432 ali the clearance around the average load on the resources of mda (Mmax Mcp Mmin), the value of mda u043eu043fu0440u0435u0434u0435u043bu00a0u044eu0442 formula;msd = c / (u043f1u0441u0440 / u043f2u0441u0440) - 1);where c is the total number of wells in the bush.;u043f1u0441u0440 - u0441u0440u0435u0434u043du00a0u00a0 productivity pumps;;u043f2u0441u0440 - expected average production wells bush;amendment (- 1) takes into account the fact that the process of selection of fluid occurs and its tributary.;the minimum value of Mmin set so that it is not less than one, and the width of the zone (Mmax - Mmin) picking up the errors in the values of parameters t how to u0443u0441u0442u0430u043du043eu0432u043bu0435u043du043du0430u00a0 width u043fu043eu043bu00a0 clearance allowed practical installation of real values in the range of medium u043fu0440u043eu0438u0437u0432u043eu0434u0438u0442u0435u043bu044cu043du043eu0441u0442u0435u0439 mda values in u0441u043eu0441u043eu0432 (u043f1u0441u0440) and the average of the expected flow rate (u043f2u0441u0440)so the Mmax was more value (mda) max and the Mmin was less than the value of (Mcp) min.;4.the device of u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0 varying loads on the common resources of the producing wells in production u0441u043au0432u0430u0436u0438u043du043du043eu0439 liquids, comprising a complete set the government, u0441u043eu0441u0442u043eu00a0u0449u0435u0435 of key u0438u0437u043cu0435u0440u0438u0442u0435u043bu00a0 u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0 block, block, with the first input key is connected with the power the power lines, the second input with the first output unit u0443u043fu0440u0430u0432u043b u0435u043du0438u00a0,solution the key u0441u0432u00a0u0437u0430u043d tyre u043fu0438u0442u0430u043du0438u00a0 electric pump and first and second gate u0438u0437u043cu0435u0440u0438u0442u0435u043bu00a0 entrance block, which is connected with the second exit block u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0, u0432u044bu0445u043e d block is connected with the entrance of u0438u0437u043cu0435u0440u0438u0442u0435u043bu00a0 u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0, u043eu0442u043bu0438u0447u0430u044eu0449u0435u0435u0441u00a0 orderwhich contains the complete devices in terms of the number of wells in the bush, and to u0438u0441u043au043bu044eu0447u0435u043du0438u00a0 peak loads on the common resources in endless cycle and asynchronous work u043au0432u0430u0436u0438u043d contains a u0443u043fu0440u0430u0432u043bu00a0u044eu0449u0435u0435 equipment, including the exchange of information, the software u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0, line, block u0432u044bu0447u0438u0441u043bu0438u0442u0435u043bu00a0, timer the block of registers, real time clock, with each block u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0,through your computer port with the first port u0441u0432u00a0u0437u0430u043d block of information exchange, which is connected with the u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0 software, a software u0443u043fu0440u0430u0432u043bu0435u043du0438 in line with the u00a0 u0441u0432u00a0u0437u0430u043d u0432u044bu0447u0438u0441u043bu0438u0442u0435u043bu00a0, timer, registers, and a real time clock, and through the exchange of information is connected to the external device u0440u043eu0439u0441u0442u0432u0430u043cu0438,the external device to the second port u043fu043eu0434u043au043bu044eu0447u0430u044eu0442u0441u00a0 block of information exchange.
机译:1.方法 u0432 u044b u0440 u0430 u0432 u043d u0438 u0432 u0430 u043d u0438 u00a0井中的负载 u0433 u043b u0443 u0431 u0438 u043d u043d u043d u043e-抽水设备, u043e u0441 u0443 u0449 u0435 u0441 u0442 u0432 u043b u043b u00a0 u044e u0449 u0435 u043c u043f u0435 u0440 u0435 u0435 u043a u0430 u0447 u043a u0443凭借 u043d u0435 u0444 u0442 u0435 u0441 u0431 u043e u0440 u0430泵的静止状态,他的工作处于无止境的抽取液循环中,并指定了 u043f1 u043f2泵抽水的主要时间 u043f u0440 u043e u0441 u0442 u043e u00a0 t3表征 u0435 u0441 u0442 u0435 u0441 u0442由 u043f u043b u0430 u0441 u0442 u0432 u043e u0432 u044b u043引起的大流量压力,其中p1为泵容量 u043d u043e u043c u0438 u043d u0430 u043b u044c u043d u0430 u00a0; p2是流体的排放, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,负载平衡 u043e u0441 u0443 u0449 u0449 u0435 u0441 u0442 u0432 u043b u00a0 u044e u0442到公用资源组dss u044b u0432 u0430 u044e u0449 u0438 u0445井, u0434 u043b u00a0井的工作流程 u0438 u0437 u043c u0435 u0440 u00a0 u044e u0442实际电流 u0432 u0440 u0435 u043c u00a0 u043f u0440 u043e u0441 u0442 u043e u00a0 pif并计算相对电流 u0432 u0440 u0435 u043c u00a0 u0440 u043e u0441 u0442 u043e u00a0作为 u0430 u0434 u0430 u043d u043d u043e u0433 u043e时间的份额 u043f u0440 u043e u043e u0441 u0442 u043e u00a0 tp = pif / t3。 u0440 u0430 u0441 u043f u0440 u0435 u0434 u0435 u043b u00a0 u044e u0442和 u0440 u0430 u043d u0436 u0438 u0440 u0443 u044e u0442降序相对时间 u043f u0440 u043e u0441 u0442 u043e u00a0井,设置最大和最小允许电流Mmax Mmin u0437 u043d u0430 u0447 u 0435 u043d u0438 u00a0在抽水井mt上工作的清洁器la, u0438 u0437 u043c u043c u0435 u0440 u00a0 u044e u0442在工作时比较抽水电流scr的员工人数 u0430 u0436 u0438 u043d mt边界 u043f u043e u043b u00a0间隙Mmin和Mmax,如果mt Mcp> Mmin), mda u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u044e u0442公式的值; msd = c /( u043f1 u0441 u0440 / u043f2 u0441 u0440-1) ;其中c是灌木丛中的油井总数。; u043f1 u0441 u0440- u0441 u0440 u0435 u0434 u043d u00a0 u00a0生产力泵;; u043f2 u0441 u0440-预期的平均生产井衬套;修正案(-1)考虑到了选择流体的过程及其支流的事实;将Mmin的最小值设定为不小于1,并确定了区域的宽度(Mmax-Mmin )找出参数t值中的错误 u0443 u0441 u0442 u0430 u043d u043e u0432 u043b u0435 u043d u043d u0430 u00a0宽度 u043f u043e u043b u00a0允许实际安装中等值 u043f u0440 u043e u0438 u0437 u0432 u043e u0434 u0438 u0442 u0435 u043b u044c u043d u043d u043e u0441 u0442 u0435 u0439 u0441 u043e u0441 u043e u0432中的mda值u043f1 u0441 u0440)和预期流速的平均值( u043f2 u0441 u0440),因此Mmax大于(mda)max值,而Mmin小于(Mcp)min。的值; 4。 u0443 u043f u0440 u0430 u0432 u043b u0435 u043d u0438 u00a0的设备在生产中 u0441 u043a u0432 u0430 u0436 u0438 u043d u043d u043e u0439液体,包括一套完整的政府, u0441 u043e u0441 u0442 u043e u00a0 u0449 u0435 u0435键 u0438 u0437 u043c u0435 u0440 u0438 u0442 u0435 u043b u043b u00a0 u0443 u043f u0440 u045 u0432 u043b u0435 u043d u0438 u00a0块,第一个输入键与电源线连接,第二个输入与第一个输出单元 u0443 u043f u0440 u0430 u0432 u043b u0435 u043d u0438 u00a0,解决键 u0441 u0432 u00a0 u0437 u0430 u043d轮胎 u043f u0438 u0442 u0430 u043d u0438 u00a0电动泵和第一,第二闸门 u0438 u0437 u043c u0435 u0440 u0438 u0442 u0435 u043b u00a0入口块,该入口块与第二个出口块 u0443 u043f u0440 u0430 u0432 u043b u0435 u043d u043d u0438 u00a0, u0432 u044b u0445 u043e d块与 u0438 u0437 u043c u0435 u0440 u0438 u0442 u0435 u0435 u043b u00a0 u0443 u043f u0440 u0430 u0430 u0432 u043b u0435 u043d u0438 u00a0, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0435 u0435 u0441 u00a0订单包含完整的d在灌木丛中的井数方面有所帮助,并且在无休止的循环和异步工作中,公用资源上的峰值负载达到 u0438 u0441 u043a u043b u043e u0447 u0435 u043d u043d u0430 u0436 u0438 u043d包含 u0443 u043f u0440 u0430 u0432 u043b u00a0 u044e u0449 u0435 u0435设备,包括信息交换,软件 u0443 u043f u0440 u0430 u0432 u043b u0435 u043d u0438 u00a0,行,块 u0432 u044b u0447 u0438 u0441 u043b u0438 u0442 u0435 u043b u00a0,定时器寄存器块,实时时钟以及每个块 u0443 u043f u0440 u0430 u0432 u043b u0435 u043d u0438 u00a0,并通过计算机端口与第一个端口 u0441 u0432 u00a0 u0437 u0430 u043d进行信息交换,与 u0443 u043f u0440 u0430 u0432 u043b u0435 u043d u0438 u00a0软件连接,该软件 u0443 u043f u0440 u0430 u0432 u043b u0435 u0435 u043d u0438 u00a0 u0441 u0432 u00a0 u0437 u0430 u043d u0432 u044b u0447 u0 438 u0441 u043b u0438 u0442 u0435 u043b u00a0,计时器,寄存器和实时时钟,并通过信息交换连接到外部设备 u0440 u043e u0439 u0441 u0442 u0432 u0430 u043c u0438,外部设备到第二个端口 u043f u043e u0434 u043a u043b u044e u0447 u0430 u044e u044e u0442 u0441 u00a0信息交换块。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号