首页> 外国专利> SCREW PILE, SCREW PILE INSTALLATION METHOD, SCREW PILE DRIVING MEANS AND OPEN-CUT TUNNELING METHOD WITH THE USE OF SCREW PILE

SCREW PILE, SCREW PILE INSTALLATION METHOD, SCREW PILE DRIVING MEANS AND OPEN-CUT TUNNELING METHOD WITH THE USE OF SCREW PILE

机译:螺钉桩,螺钉桩安装方法,螺钉桩驱动装置和利用螺钉桩的明挖隧道方法

摘要

FIELD: building, particularly to erect load-bearing foundation, to retain installation on ground surface and to drive underwater and ground-surface tunnels.;SUBSTANCE: screw pile comprises metal pipe with helical winding formed on the metal pipe and with concrete head installed on the pipe. Concrete head has thickness equal to 1/4-5 pipe diameters. Metal rods having length equal to that of concrete head are built in the concrete head. The helical winding extends along the full shaft length and is made as helical blade with width equal to 0.5-5 concrete head diameters. The helical winding has conical part formed in lower pile part and extending for the length equal to not more than 1/3 of pile length. Triangular stiffening ribs are distributed over the full helical blade surface and have bases connected with each other and abutting metal pipe. Apexes of the stiffening ribs are located at blade edge. Apex of each stiffening rib is provided with metal rod. Metal rods of stiffening ribs are connected with each other by metal reinforcement members embedded in blade edge. Additional triangular stiffening ribs are created in the blade. The additional triangular stiffening ribs extend transversely to main stiffening ribs and have bases connected with pipe. Additional stiffening ribs have apexes fastened to apexes of corresponding main stiffening ribs. Connection member adapted to connect the screw pile with building structure is located in upper pipe part. The connection member is made as header provided with thread or ribbed reinforced concrete header. Upper part of the header is fitted with hook fixer. Lower part thereof has bolt to provide keyed pile driving means fixation. Screw pile driving method and means, as well as tunneling method or method for underground passage construction by open-cut method with the use of the screw pile are also disclosed.;EFFECT: increased structural load-bearing ability, simplified structure, accuracy and reliability of screw pile driving, as well as possibility to drive pile in densely built-up areas.;5 cl, 7 dwg
机译:领域:建筑物,特别是用于竖立承重基础,以保持在地面上的安装并驱动水下和地面隧道的工作;实体:螺旋桩包括金属管,金属管上螺旋缠绕,金属头安装在该金属管上管道。混凝土头的厚度等于管道直径的1 / 4-5。长度等于混凝土头部的金属棒内置在混凝土头部中。螺旋绕组沿整个轴长延伸,并制成宽度等于0.5-5混凝土头直径的螺旋叶片。螺旋形绕组具有形成在下部绒头部分中的锥形部分,并延伸不超过绒头长度的1/3的长度。三角形的加强肋分布在整个螺旋叶片表面上,并具有彼此连接并邻接金属管的基座。加强肋的顶点位于叶片边缘。每个加强肋的顶点均设有金属杆。加强肋的金属杆通过嵌入叶片边缘的金属加强件相互连接。刀片中还形成了三角形的加强肋。附加的三角形加劲肋横向于主加劲肋延伸,并具有与管道连接的底部。附加的加强肋具有固定到相应的主加强肋的顶点的顶点。在管的上部设置有适于将螺旋桩与建筑结构连接的连接构件。连接件制成带有螺纹或带肋的钢筋混凝土集管的集管。集管的上部装有挂钩固定器。其下部具有用于提供键桩驱动装置固定的螺栓。还公开了螺钉桩的驱动方法和装置,以及利用螺钉桩进行明挖法进行地下通道施工的隧道方法或方法。效果:增加了结构的承载能力,简化了结构,准确性和可靠性螺旋桩打桩的可能性,以及在密集建筑区域打桩的可能性。; 5 cl,7 dwg

著录项

  • 公开/公告号RU2288326C1

    专利类型

  • 公开/公告日2006-11-27

    原文格式PDF

  • 申请/专利权人 KOZLOVICH ARKADIJ VIKTOROVICH;

    申请/专利号RU20050116175

  • 发明设计人 KOZLOVICH ARKADIJ VIKTOROVICH;

    申请日2005-05-24

  • 分类号E02D5/56;E02D7/22;

  • 国家 RU

  • 入库时间 2022-08-21 20:30:44

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号