首页> 外国专利> INTERGRATION CONSTRUCTION BETWEEN A BOILER AND A STEAM TURBINE AND METHOD IN PREHEATING OF THE SUPPLY WATER FOR A STEAM TURBINE AND IN ITS CONTROL

INTERGRATION CONSTRUCTION BETWEEN A BOILER AND A STEAM TURBINE AND METHOD IN PREHEATING OF THE SUPPLY WATER FOR A STEAM TURBINE AND IN ITS CONTROL

机译:锅炉与汽轮机的一体化建设及汽轮机给水预热的方法及其控制

摘要

The present invention concerns an integration construction between a steamboiler provided with a combustion chamber and a steam turbine. The steam isconducted from the steam boiler (10) along a connector to the steam turbine(11) for rotating an electric generator (K) producing electricity. The supplywater circulated via the steam boiler (10) is vaporized in a vaporizer (190)located in the steam boiler (10) and superheated in a superheater (120). Thesupply water is conducted into the boiler through an economizer (20) acting asa heat exchanger, where heat is transferred from the flue gases of the boilerinto the supply water. The economizer (20) is provided with at least twosections, comprising at least one first economizer section (20a1) and at leastone second economizer section (20a2). The supply water is conducted from thefirst economizer section (20a1) to a supply water preheater formed from a heatexchanger (14), where thermal energy is transferred from bled steams of thesteam turbine either directly or via a medium, advantageously water, into thesupply water. The supply water preheated with bled steams of the steam turbineis conducted in the steam boiler (10) to the second economizer section (20a2)and further to the vaporizer (190) and the superheater (120) and therethrough,in the form of steam, to the steam turbine. In the integration construction,the temperature of the supply water is raised continuously as the supply wateris flowing in the first economizer section (20a1) and from the firsteconomizer section (20a1) to the supply water preheater (14) and threthrough,to the second economizer section (20a2). The connector (13a1.1) leading to thesupply water preheater (14) comprises a valve (21) for controlling the bled-steam flow to the preheater (14). The present invention concerns also a methodin the preheating of the supply water for a steam turbine and in its control.
机译:本发明涉及蒸汽之间的集成构造。锅炉,具有燃烧室和蒸汽涡轮。蒸汽是从蒸汽锅炉(10)沿着连接器引导至蒸汽轮机(11)用于旋转发电的发电机(K)。供应经由蒸汽锅炉10循环的水在汽化器190中汽化。位于蒸汽锅炉(10)中并在过热器(120)中过热。的供水通过节能器(20)导入锅炉换热器,热量从锅炉的烟气中传递进入供水。节能器(20)具有至少两个部分,包括至少一个第一省煤器部分(20a1)和至少一个一第二省煤器部分(20a2)。供水是从第一节热器部分(20a1)到由热量形成的供水预热器热交换器(14),其中热能从蒸汽轮机直接或通过介质(最好是水)进入汽轮机供水。用汽轮机的放气蒸汽预热的供水在蒸汽锅炉(10)中被引导至第二省煤器部分(20a2)进一步到达汽化器(190)和过热器(120)并从中通过,以蒸汽的形式送到汽轮机。在整合建设中供水温度随着供水温度的升高而持续升高从第一节油器部分(20a1)开始流动节水器部分(20a1)到达供水预热器(14)并通过到第二节能器部分(20a2)。连接器(13a1.1)通向供水预热器(14)包括一个阀(21),用于控制蒸汽流到预热器(14)。本发明还涉及一种方法蒸汽轮机的供水预热及其控制。

著录项

  • 公开/公告号CA2433426C

    专利类型

  • 公开/公告日2008-10-28

    原文格式PDF

  • 申请/专利权人 FORTUM OYJ;

    申请/专利号CA20012433426

  • 发明设计人 RAIKO MARKKU;

    申请日2001-01-02

  • 分类号F01K7/40;F01K23/10;F22D1/40;

  • 国家 CA

  • 入库时间 2022-08-21 20:03:54

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号