首页>
外国专利>
Product e.g. primary product, manufacturing arrangement, has control device receiving actual data from detection devices and process plant by current process of products and adjusting current process to optimized process of product
Product e.g. primary product, manufacturing arrangement, has control device receiving actual data from detection devices and process plant by current process of products and adjusting current process to optimized process of product
The arrangement (10) has a control device (12) for fine planning and optimizing a manufacture of products and arranged between a customer order data detection device (14) i.e. enterprise resource planning-device, and a process plant (16). The control device receives an actual data from the customer order data detection device, a capacity parameter detection device, a noise parameter detection device and the plant by a current manufacturing process of the products. The control device adjusts the current process to an optimized manufacturing process of the products. An independent claim is also included for a method for time and quantity and/or throughput optimized manufacturing of a product.
展开▼