首页> 外国专利> CONSTRUCTION COST MANAGEMENT DEVICE AND METHOD

CONSTRUCTION COST MANAGEMENT DEVICE AND METHOD

机译:施工成本管理装置及方法

摘要

PROBLEM TO BE SOLVED: To easily calculate productivity in a work group in reference to standard productivity.;SOLUTION: A cost ratio r(j, i) of an item of each work in the work group is calculated in each item in reference to the standard productivity. The ratio r(j, i) of each work is multiplied by a necessary amount of each item backed by results, and inputted about the work group, and the productivity of the work, i.e., the necessary amount mi of the item of the work is calculated by mi=Ni×r(j, i). Cost of the item i is obtained by Ni×r(i, j)×c'(i), and unit price of a work amount unit of the work j is calculated by Σi(Ni×r(i, j)×c'(i)/Oj) when a work amount of the work j is set as Oj.;COPYRIGHT: (C)2009,JPO&INPIT
机译:解决的问题:参照标准生产率轻松计算工作组中的生产率。解决方案:参考以下标准,在每个项目中计算出工作组中每个项目的成本比r(j,i)。标准生产率。将每个作品的比率r(j,i)乘以每个项目的必要数量,再加上结果作为结果,并输入有关工作组和工作效率的信息,即必要数量m i 由m i = N i × r(j,i)计算。项i的成本通过N i ×r(i,j)×c′(i)获得,并且工件j的工作量单位的单价通过&Sigma计算。 i (N i × r(i,j)× c'(i)/ O j )作品j设置为O j .;版权所有:(C)2009,JPO&INPIT

著录项

  • 公开/公告号JP2009205454A

    专利类型

  • 公开/公告日2009-09-10

    原文格式PDF

  • 申请/专利权人 MIYA SYSTEM INC;

    申请/专利号JP20080047225

  • 发明设计人 MIYAWAKI KIYOYUKI;

    申请日2008-02-28

  • 分类号G06Q50/00;

  • 国家 JP

  • 入库时间 2022-08-21 19:44:13