首页>
外国专利>
Apparatuses, Systems and Methods for Pre-Configuring New Structure Foundations For Soil Gas Mitigation Systems
Apparatuses, Systems and Methods for Pre-Configuring New Structure Foundations For Soil Gas Mitigation Systems
展开▼
机译:预先配置土壤气体缓解系统新结构基础的设备,系统和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for pre-configuring a foundation of a new structure, includes providing an apparatus that has a base end and an opposing end, the apparatus arranged such that the perimeter of the base end is longer than the perimeter of the opposing end, placing the apparatus on the base end at a desired location within the perimeter of a frame arranged to confine pre-cured concrete and applying pre-cured concrete within the frame. A system for preventing the migration of soil gas into a structure includes a soil gas barrier, a layer of permeable material and an apparatus. The apparatus is in contact with the soil gas barrier and has a base end with a first port forming a first area and an opposing end with an output port having a second area that is smaller than the first area.
展开▼