首页>
外国专利>
System and method for optimized swing modulo scheduling based on identification of constrained resources
System and method for optimized swing modulo scheduling based on identification of constrained resources
展开▼
机译:基于受限资源识别的优化挥杆模调度的系统和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method, computer program product, and a data processing system for scheduling instructions in a data processing system are provided. Dependencies among a plurality of nodes are analyzed to determine if any of the plurality of nodes uses a constrained resource. Each of the plurality of nodes represents an instruction in a set of instructions. A subset of the plurality of nodes is designated as resource-constrained nodes. An attempt is made to generate a schedule with the subset of the plurality of nodes scheduled with priority with respect to any of the plurality of nodes not included in the subset.
展开▼