首页>
外国专利>
METHOD FOR CONSTRUCTING A KAI LANDING AND KAI LANDING
METHOD FOR CONSTRUCTING A KAI LANDING AND KAI LANDING
展开▼
机译:构造启航着陆的方法和启航着陆
展开▼
页面导航
摘要
著录项
相似文献
摘要
The erection process for a quay involves producing a wall (10) which during the final back-filling with bottom material is anchored with the aid of anchor rods (22) to a rear anchor table (24) over the bottom (14). The bottom material is filled in layers to the top level (16), and the anchor rods are at a horizontal spacing from each other under the water, where they are connected at their ends to the anchor table.
展开▼