首页>
外国专利>
CONSTRUCTION PROJECT PERFORMANCE MANAGEMENT METHOD AND SYSTEM USING BSC AND THE DATA WAREHOUSE
CONSTRUCTION PROJECT PERFORMANCE MANAGEMENT METHOD AND SYSTEM USING BSC AND THE DATA WAREHOUSE
展开▼
机译:基于平衡计分卡和数据仓库的工程项目绩效管理方法和系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
A kind of method, for the performance for the capital investment program based on data warehouse that one BSC of management and utilization and its system are arranged to manage the achievement of the target of a project on the basis of project and are utilized when comparing performance between project, by passing through the performance of the data management project of measurement within project. A kind of method, for managing the performance management operation flow of a capital investment program, directly using being present in a management system in capital investment program and different outcome datas. Performance management method includes the following steps:: determining the viewpoint of management by the way that BSC concepts are applied to capital investment program, the target of each managerial perspective of inference and success factor is to establish the performance measurement index of each viewpoint; According to the data of performance measurement index-modeling work data, the stress model data in a data warehouse; Mostly dimensionally by analyzing the model result being stored in data warehouse using OLAP; There is provided analysis leads to a kind of confirmable form.
展开▼