with the development of beijing (sizing) of heat supply device, as in more detail in the boiler 5 ~ 6kg degree of heating, the heat created by the heating device to supply the heat supply device through a steam supply line to each of you, at this time, the steam valve lane part of the heat supply device, and the heat exchanger in heating and heat supply device for recycled use external emissions, and then use the flowers, not only at the 120 ~ 130 degrees, high temperature and high pressure water can ud0f1ud06cub97c without condensation of heat supply device. that is the investment of the heat supply device temperature is always kept a certain heat supply device, the fuel of the car (b / c) and so to reduce, the heat supply device used to reduce water usage, and greatly to be able to open up in beijing. the supply device. it will be.
展开▼