首页> 外国专利> METHOD FOR DEVELOPMENT OF ORE BODIES IN ZONES OF ORE CONTACT AND OVERBURDEN BY SUBBENCHES

METHOD FOR DEVELOPMENT OF ORE BODIES IN ZONES OF ORE CONTACT AND OVERBURDEN BY SUBBENCHES

机译:突触法在接触带和覆岩带中发育矿体的方法

摘要

FIELD: mining.;SUBSTANCE: invention relates to mining industry and may be used in development of mineral deposits by open method. Method includes separation of payout bed in zones of contact into subbenches with height that depends on angle of ore body inclination, its thickness, and development from drilling of wells at the side of lying wall of deposit at the distance from contact along horizontal line, corresponding to minimum area of shed triangle of ore, and further two layers of wells as bench is separated into two subbenches with angle of ore body drop of 25-30° are drilled with depth with slight subdrilling of contact surface, and the last row of wells on the side of lying wall of deposit is drilled with depth for the whole height of bench with required subdrilling to minimise area of ore triangle included into ore mass. And at the side of hanging wall of deposit such area of ore triangle is achieved by laying a trench from the side of hanging wall with depth that corresponds to height of upper subbench, and after its tunneling lower payout bed for minimisation of ore losses is developed by drilling of the first and second row wells by ore from the side of hanging wall of deposit, and diluted ore mass after drilling and explosion of walls in the 3rd and 4th rows in zone of trench bottom is removed and stacked into dump of noncommercial ores. As angle of deposit inclination increases up to 40-45°, operations of bench height division into subbenches and trench arrangement by drilling of wells on the side of lying wall, and then hanging wall, are repeated, besides in case it is impossible to arrange a trench on the side of hanging wall, the first row of wells on the side of hanging wall of deposit is drilled near contact of ore with rock in development of ore in layer of the first subbench, and after its explosion and removal the 2nd and 3rd rows are drilled in overburden rocks, and after explosion and removal of rock, wells are drilled in payout bed of the 2nd, 3rd subbenches so that a common slope of bench could be arranged for its whole height.;EFFECT: reduction of ore losses and its dilution 2-3 times.;1 ex, 7 dwg
机译:技术领域本发明涉及采矿业,可用于通过露天法开发矿床。方法包括将接触区中的放出层分成高度取决于矿体倾斜角度,其厚度的层级,以及在沉积层的侧壁沿水平线与接触层之间的距离钻出井眼所产生的高度,相应到最小的矿石散布三角形区域,然后将工作台分成两部分,再将两层井分成两部分,矿体的倾角为25-30°,并在深度上进行钻探,并在接触面稍加钻探,最后一排井在矿床卧壁的侧面上,钻进深度为整个工作台高度,并进行必要的钻削,以最大程度地减少包含在矿石块中的三角形矿石的面积。并且在矿床的悬挂壁的一侧,通过从悬挂壁的一侧铺设深度与上子台架高度相对应的沟槽来实现矿石三角形的这种区域,并在其开挖后开发出用于降低矿石损失的下部支付层通过从矿床悬挂壁的侧面钻出第一排和第二排井,并在第3 rd 和第4 去除沟槽底部区域中的行并将其堆叠到非商业矿石堆中。当沉积物倾斜角增加到40-45°时,将重复进行工作台高度划分工作,即先在卧壁一侧钻井,再在吊壁上钻凿子槽,然后再进行沟壁布置,以防无法布置悬挂壁一侧的沟槽,在第一子台架层的矿石发育过程中,在矿床与岩石接触的附近钻出第一排井,然后爆炸并去除2 <在覆盖岩中钻出Sup> nd 和3 rd 行,爆炸和清除岩石后,在2 nd 的支付层中钻井, 3 rd 子长凳,以便在整个台阶上都可以布置一个共同的台阶;效果:减少矿石损失并将其稀释2-3倍; 1 ex,7 dwg

著录项

  • 公开/公告号RU2398111C1

    专利类型

  • 公开/公告日2010-08-27

    原文格式PDF

  • 申请/专利权人 EREMIN GEORGIJ MIKHAJLOVICH;

    申请/专利号RU20090113220

  • 发明设计人 EREMIN GEORGIJ MIKHAJLOVICH;

    申请日2009-04-08

  • 分类号E21C41/26;

  • 国家 RU

  • 入库时间 2022-08-21 18:29:32

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号