首页>
外国专利>
WORK SCHEDULE MANAGEMENT DEVICE, WORK SCHEDULE MANAGEMENT METHOD, AND CONTROL PROGRAM FOR THE WORK SCHEDULE MANAGEMENT DEVICE
WORK SCHEDULE MANAGEMENT DEVICE, WORK SCHEDULE MANAGEMENT METHOD, AND CONTROL PROGRAM FOR THE WORK SCHEDULE MANAGEMENT DEVICE
展开▼
机译:工作时间表管理装置,工作时间表管理方法以及工作时间表管理装置的控制程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a maintenance management device for elevator, capable of preparing an efficient work schedule, while following the restrictions, such as a work execution time limit, regarding the work newly generated.;SOLUTION: The work schedule management device for managing schedules of work to be executed respectively in a plurality of buildings includes a scheduled objective day determining unit 31 for acquiring information of the new work and information regarding the restriction of execution timing of the new work, and for determining a candidate day for the timing to execute the new work, based on the acquired information; a priority determining unit 33 for extracting a schedule of the work executed on the determined candidate day, among the existing schedules, and for determining a worker in charge for the new work, based on a distance between the objective building of the work in the extracted existing schedule and the objective building of the new work; and a schedule preparation unit 34 for updating the existing schedule, by adding the schedule of the new work.;COPYRIGHT: (C)2011,JPO&INPIT
展开▼