PROBLEM TO BE SOLVED: To rationally build and backfill a shield tunnel to be backfilled in the future.;SOLUTION: When building the shield tunnel, when a shield machine passes through a backfilling starting expected point, a cylindrical timbering member 3 is prearranged outside a segment assembled at the point. When backfilling the built shield tunnel, a disassembling machine 8 is assembled with the timbering member as a skin plate at the backfilling starting expected point, and the segment 5 is disassembled and removed on its inside while timbering by the disassembling machine, and a backfilling material 11 is filled on the rear side in its moving direction while moving the disassembling machine. The timbering member is preinstalled inside a tail part of the skin plate of the shield machine. A face plate 10 functioning as a filling form of the backfilling material is arranged inside the timbering member.;COPYRIGHT: (C)2008,JPO&INPIT
机译:解决的问题:为了合理地建造和回填将来要回填的盾构隧道;解决方案:在建造盾构隧道时,当盾构机经过回填起点时,圆柱状的木料构件3被预先布置在段组装在该点。当回填建造的盾构隧道时,在回填开始的预期点处将拆解机8与木材构件作为皮板组装在一起,并且在通过拆解机进行拆木的同时,将段5在其内部拆解并移除,并使用回填材料在移动拆卸机的同时,在其移动方向的后侧填充有图11所示的孔。木材构件被预先安装在屏蔽机的蒙皮板的尾部内部。在木材构件内部布置有用作回填材料的填充形式的面板10。版权所有:(C)2008,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号