PROBLEM TO BE SOLVED: To provide a system for aiding the operation of water reservoir facility or the like, which reduces non-utilized discharged water.;SOLUTION: In a management planning system 30, the total expectation value ΣP(Rm+1|Rm)Fm+1(ST, Hm+1, Rm+1) of accumulated power generation amount Fm+1 up to (m+1) month, which is obtained by changing and totaling a flow amount Rm+1, is added to a power generation amount B (Hm, Rm, Hm+1) in m-month calculated based on the water level Hm of m-month, the water level Hm+1 of the next following month and the flow amount Rm of the current month. A value obtained by multiplying a square of the non-utilized discharged water amount Sm of m-month by a penalty coefficient a*, is deducted from the value obtained by the addition, to calculate an accumulated value, so that the water lever maximized in the accumulated value is determined.;COPYRIGHT: (C)2011,JPO&INPIT
机译:解决的问题:提供一种用于辅助水库设施等的操作的系统,该系统减少未利用的排放水。解决方案:在管理计划系统30中,总期望值&Sigma; P(R m + 1 | R m )F m + 1 (ST,H m + 1 ,R m最多(m + 1)个月的累计发电量F m + 1 的+1 ),这是通过更改和总计流量R m + 1 < / Sub>,与计算出的m个月的发电量B(H m ,R m ,H m + 1 )相加根据m个月的水位H m ,下个月的水位H m + 1 和流量R m 当月的。从通过计算得出的值中减去通过将m个月的未使用排放水量S m 的平方乘以惩罚系数a * 所获得的值。另外,要计算一个累加值,以便确定累加值最大化的水位杆。;版权所有:(C)2011,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号