首页> 外国专利> PROCEDURE FOR MOVING A WIND TURBINE COMPONENT, SUCH AS A WIND TURBINE BUSH, FROM A TRANSPORTATION POSITION TO A WIND TURBINE ASSEMBLY POSITION IN OR ON THE GOND, THE MAIN TREE OR THE HUB, MANIPULATION UNIT WIND AND USE OF THE SAME.

PROCEDURE FOR MOVING A WIND TURBINE COMPONENT, SUCH AS A WIND TURBINE BUSH, FROM A TRANSPORTATION POSITION TO A WIND TURBINE ASSEMBLY POSITION IN OR ON THE GOND, THE MAIN TREE OR THE HUB, MANIPULATION UNIT WIND AND USE OF THE SAME.

机译:将风轮机组件(如风轮机衬套)从运输位置移动到位于,主树或轮毂上的风轮机组件位置,主树或轮毂,操纵装置上的风,以及使用它们的过程。

摘要

Method for moving a wind turbine component, such as a wind turbine bushing, from a transport position to a wind turbine assembly position, said procedure comprising the steps of: coupling a handling unit to a structural part of the wind turbine component. wind turbine, operatively connect the handling unit to a metal cable of a crane system, then raise the handling unit and, therefore, the wind turbine component with the crane system to an assembly position of the wind turbine, the handling unit and the wind turbine component being suspended from said metal cable, and rotating the wind turbine component with the handling unit while they are suspended and during lifting of the wind turbine component in order to Orient the wind turbine component for assembly.
机译:用于将诸如风力涡轮机衬套的风力涡轮机组件从运输位置移动到风力涡轮机组件位置的方法,所述过程包括以下步骤:将处理单元联接至风力涡轮机组件的结构部件。风力涡轮机,将处理单元可操作地连接到起重机系统的金属电缆,然后将处理单元以及具有起重机系统的风力涡轮机组件抬高到风力涡轮机,处理单元和风力涡轮机的组装位置组件从所述金属电缆悬挂下来,并在操纵单元悬挂时以及在风力涡轮机组件抬起期间通过操纵单元旋转风力涡轮机组件,以使风力涡轮机组件定向以进行组装。

著录项

  • 公开/公告号ES2350623T3

    专利类型

  • 公开/公告日2011-01-25

    原文格式PDF

  • 申请/专利权人 VESTAS WIND SYSTEMS A/S;

    申请/专利号ES20080700900T

  • 发明设计人 PEDERSEN GUNNAR;

    申请日2008-01-24

  • 分类号F03D1;F03D1/06;

  • 国家 ES

  • 入库时间 2022-08-21 18:02:51

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号