首页>
外国专利>
PROCEDURE FOR MOVING A WIND TURBINE COMPONENT, SUCH AS A WIND TURBINE BUSH, FROM A TRANSPORTATION POSITION TO A WIND TURBINE ASSEMBLY POSITION IN OR ON THE GOND, THE MAIN TREE OR THE HUB, MANIPULATION UNIT WIND AND USE OF THE SAME.
PROCEDURE FOR MOVING A WIND TURBINE COMPONENT, SUCH AS A WIND TURBINE BUSH, FROM A TRANSPORTATION POSITION TO A WIND TURBINE ASSEMBLY POSITION IN OR ON THE GOND, THE MAIN TREE OR THE HUB, MANIPULATION UNIT WIND AND USE OF THE SAME.
Method for moving a wind turbine component, such as a wind turbine bushing, from a transport position to a wind turbine assembly position, said procedure comprising the steps of: coupling a handling unit to a structural part of the wind turbine component. wind turbine, operatively connect the handling unit to a metal cable of a crane system, then raise the handling unit and, therefore, the wind turbine component with the crane system to an assembly position of the wind turbine, the handling unit and the wind turbine component being suspended from said metal cable, and rotating the wind turbine component with the handling unit while they are suspended and during lifting of the wind turbine component in order to Orient the wind turbine component for assembly.
展开▼