THE CONSTRUCTION METHOD OF CONTINUOUS PILE WALLS USING GUIDE WING IN UNDER GROUND
THE CONSTRUCTION METHOD OF CONTINUOUS PILE WALLS USING GUIDE WING IN UNDER GROUND
展开▼
机译:地下连续导墙桩墙的施工方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: the Cast place in building underground CIPs (stake) is configured to ensure that water-stop and efficient structure using guide vane, passes through congruent pile without shell. ;CONSTITUTION: a kind of construction method use of underground CIPs guide vanes is as follows. The drilling (execution) of drilling machine. The guide vane is plugged in the hole B drilled out. Concrete or mortar are filled in guide vane inside the region of upper and lower part and guide vane in each drilling (C groups). D between the adjacent hole in mesoporous hole. Mesoporous and the E in side area guide vane are filled with inside concrete or mortar. The concrete or mortar poured into solidifies to complete underground CIPs (F. ;The 2011 of copyright KIPO submissions