首页> 外国专利> THE CONSTRUCTION METHOD OF CONTINUOUS PILE WALLS USING GUIDE WING IN UNDER GROUND

THE CONSTRUCTION METHOD OF CONTINUOUS PILE WALLS USING GUIDE WING IN UNDER GROUND

机译:地下连续导墙桩墙的施工方法。

摘要

PURPOSE: the Cast place in building underground CIPs (stake) is configured to ensure that water-stop and efficient structure using guide vane, passes through congruent pile without shell. ;CONSTITUTION: a kind of construction method use of underground CIPs guide vanes is as follows. The drilling (execution) of drilling machine. The guide vane is plugged in the hole B drilled out. Concrete or mortar are filled in guide vane inside the region of upper and lower part and guide vane in each drilling (C groups). D between the adjacent hole in mesoporous hole. Mesoporous and the E in side area guide vane are filled with inside concrete or mortar. The concrete or mortar poured into solidifies to complete underground CIPs (F. ;The 2011 of copyright KIPO submissions
机译:用途:用于建造地下CIP(桩)的浇铸场所经配置可确保使用导向叶片的止水和高效结构穿过无壳的全堆。 ;构成:地下CIP导向叶片的一种施工方法如下。钻孔机的钻孔(执行)。导向叶片插入钻出的孔B中。在每次钻进(C组)时,在上部和下部区域内的导叶中填充混凝土或灰浆,并导叶。介孔内的相邻孔之间有D。中孔和E型侧面导流叶片内填充有混凝土或砂浆。将混凝土或砂浆倒入固化以完成地下CIP(F.; 2011年提交的版权KIPO提交文件)

著录项

  • 公开/公告号KR20100124234A

    专利类型

  • 公开/公告日2010-11-26

    原文格式PDF

  • 申请/专利权人 CHUNG DONG UK;GONG YOUNG JOO;

    申请/专利号KR20100110089

  • 发明设计人 GONG YOUNG JOO;CHUNG DONG UK;

    申请日2010-11-06

  • 分类号E02D5/06;E02D5/20;

  • 国家 KR

  • 入库时间 2022-08-21 17:53:15

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号