首页>
外国专利>
REHABILITATION METHOD OF EXCAVATED SITE AND SPACE IN QUARRYING AND MINING AREA AND ABANDONED MINING AND TUNNEL
REHABILITATION METHOD OF EXCAVATED SITE AND SPACE IN QUARRYING AND MINING AREA AND ABANDONED MINING AND TUNNEL
展开▼
机译:采空区开挖场地空间修复及废弃矿山和隧道的修复方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: method for reconstructing is to excavate part or a segment time portion tor, stope, mine, coal mine, abandoned mine, Abandoned Tunnel are provided to recovery and excavate part or a segment time portion tor, stope, mine, coal mine, abandoned mine, Abandoned Tunnel Deco is with open arms and economically, it is filled using as alternate sites, reduces the industrial by-products that burden is abandoned and recycled. ;CONSTITUTION: method for reconstructing is to excavate part or a segment time portion tor, stope, mine, coal mine, abandoned mine, Abandoned Tunnel restore one or more and excavate part or space segment tor, stope, mine, coal mine, abandoned mine, by building Abandoned Tunnel as in landfill yard, industrial by-products are used again, and ridging is with artificial soil material or covering artificial soil material. ;The 2011 of copyright KIPO submissions
展开▼