首页> 外国专利> CONSTRUCTION METHOD USING DELAYED JOINING FOR ENSURING THE COST EFFICIENCY AND EARTHQUAKE RESISTANCE OF A BEAM BY REDUCING THE END BENDING MOMENT OF THE BEAM

CONSTRUCTION METHOD USING DELAYED JOINING FOR ENSURING THE COST EFFICIENCY AND EARTHQUAKE RESISTANCE OF A BEAM BY REDUCING THE END BENDING MOMENT OF THE BEAM

机译:通过减少梁的最终弯矩来确保梁的成本效率和抗震能力的延迟连接构造方法

摘要

PURPOSE: A construction method using delayed joining for ensuring the cost efficiency and earthquake resistance of a beam is provided to reduce end bending moment of a beam by dividing load into first and second sections so that the end of the beam resists to loading capacity and lateral load. ;CONSTITUTION: A construction method using delayed joining for ensuring the cost efficiency and earthquake resistance of a beam is as follows. The column of a cross section calculated by a structure calculation is manufactured and obtained from a factory. Length and cross section are calculated by structure calculation and a bracket is manufactured by limiting its length to be within 15% of the whole length of a beam. A part, which excludes the bracket of both ends among the whole length of the beam, is formed as an intermediate beam. The intermediate beam and the bracket are connected by a high tension bolt.;COPYRIGHT KIPO 2011
机译:目的:提供一种使用延迟连接的施工方法,以确保梁的成本效率和抗震性,通过将载荷分为第一和第二部分来减少梁的端部弯矩,以使梁的端部承受载荷能力和横向加载。 ;构成:采用延迟连接以确保梁的成本效率和抗震性的施工方法如下。通过结构计算而计算出的截面的列是从工厂制造而获得的。通过结构计算来计算长度和横截面,并通过将其长度限制在梁总长度的15%以内来制造支架。在梁的整个长度中不包括两端的支架的部分形成为中间梁。中间梁和支架通过高压螺栓连接。; COPYRIGHT KIPO 2011

著录项

  • 公开/公告号KR20110067965A

    专利类型

  • 公开/公告日2011-06-22

    原文格式PDF

  • 申请/专利权人 LEE CHANG NAM;

    申请/专利号KR20090124764

  • 发明设计人 LEE CHANG NAM;

    申请日2009-12-15

  • 分类号E04B1/24;E04B1/58;

  • 国家 KR

  • 入库时间 2022-08-21 17:51:41