The present invention includes a first hydraulic cylinder installed in the lower portion of the first arm of the molding machine to the molding machine of the hydraulic gumeongtan The lower end portion for forming a hole in the fixed RAM gumeongtan to the first hoisting frame having a plurality of molding pins are male part is a pin-porous sepin is elevated by (A) and, in the second hydraulic cylinder installed in the top of the first support The forming tube around which a pressure type of pingong gumeongtan the second platform having a pin that is moved up and down by pneumatic male part (B), a first molded part provided with a stamp w gumeongtan of shaping the gumeongtan the pressure plate is moved up and down by a steel sheet (C ), a first pair of geolrimdae the rear locked in place with a lock for locking jaw fixed to the support will be provided on the pressure plate is composed of a combination of a first cam for unlocking the latching member wins the steel having a locking portion (D) . the ; molding and the molding pins by simultaneous gumeongtan gumeongtan forming section (D) for forming a pingong by is intermittently rotated in a horizontal rotary pin gumeongtan male part fills the porous pellets for molding tube (A) upper and lower end portions of the holes in the air gumeongtan presses the periphery of the pin by a pneumatic sepin male part (B) in the return phase side pin and the small holes formed in a porous male part by the locking portion (D) (A) a molded part during the return gumeongtan gumeongtan molded when temporarily suppress the rise of the pin to fall into the molding (C) is to prepare a gumeongtan continuously maintained so as not break.
展开▼