首页>
外国专利>
ECO-FRIENDLY ENGINEERING, LANDSCAPING, PARKS, CONSTRUCTION OF BOUNDARY STONE TO HACHEONYONG PRESS
ECO-FRIENDLY ENGINEERING, LANDSCAPING, PARKS, CONSTRUCTION OF BOUNDARY STONE TO HACHEONYONG PRESS
展开▼
机译:生态友好型工程,景观美化,公园,八面Y新闻界界石的建设
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a pedestrian boundary stone that is constructed between the sidewalk and the boundary, and more particularly, while preventing the phenomena of swelling when the poured concrete is injected by the formwork installed in close contact with the sidewalk boundary, In order to ensure that the constructed sidewalk boundary stone also has affinity with the surrounding conditions, Claims [1] A method of constructing a sidewalk boundary stone using formwork at a boundary surface in contact with a sidewalk, comprising: a fixed shaft fixing step of driving a plurality of fixed shafts at regular intervals in order to tightly fix the formwork on both sides of the boundary ground surface; A formwork connecting step of inserting and connecting the respective insertion protrusions and the insertion grooves formed at positions corresponding to each other of the end faces of the formwork to the inside of the fixed shaft; In the process of connecting the formwork by means of a close contact is formed by the eccentric cam end is slidingly supported by the coupling groove formed on the outer surface of the formwork, the other end is engaged with the fixed shaft and rotated in contact with the fixed shaft A close fixing step of tightly fixing the formwork to the fixed shaft side; A filling step of filling concrete poured between the two fixed molds; A finishing material applying step of forming a lower part of the finishing material to be embedded in the concrete and protruding the upper part of the concrete while applying the environmentally friendly materials to the upper surface of the concrete before the filled concrete is cured; A formwork dismantling step of dismantling formwork after a concrete curing period after the finishing material coating step; It relates to a construction method of nature-friendly civil engineering, landscaping, parks, river sidewalk boundary stone comprising a.
展开▼