首页>
外国专利>
Scheduling of new job within a start time range based on calculated current load and predicted load value of the new job on media resources
Scheduling of new job within a start time range based on calculated current load and predicted load value of the new job on media resources
展开▼
机译:根据计算出的当前负载和媒体资源上新作业的预计负荷值,在开始时间范围内调度新作业
展开▼
页面导航
摘要
著录项
相似文献
摘要
Method for scheduling a new backup job within a backup application to optimize a utilization of a media resource of said backup application. The backup application includes one or more previously scheduled backup jobs. The backup application calculates a current load of the media resource as a function of the previously scheduled backup jobs and the media resource and predicts a load value for the new backup job as a function of job parameters associated with the new backup job. Then, the backup application schedules the new backup job as a function of the calculated current load and the predicted load value such that the resulting load on the media resource will yield a minimum peak percentage utilization of the media resource. Alternatively, the backup application schedules the new backup job and previously scheduled backup jobs as function of the calculated current load and the predicted load value such that the resulting load on the media resource will yield a minimum peak percentage utilization of the media resource.
展开▼