Methods for establishing and cancelling a construction site area in a central registration system for a traffic infrastructure network, in particular a rail-based traffic infrastructure network
Methods for establishing and cancelling a construction site area in a central registration system for a traffic infrastructure network, in particular a rail-based traffic infrastructure network
A method for establishing a construction site area (CSA; CSA1, CSA2) in a central registration system (21) for a traffic infrastructure network (10), wherein a supervisor (SV) establishes (106) the construction site area within the central registration system (21) after a safeguard assistant (SGA) has requested (103) or consented to (108) establishing the construction site area, is characterized in that the central registration system (21) allows the establishing (106) of the construction site area only if the safeguard assistant was, at the point of time of notifying his request (103) or consent (108), within a defined close-up area (CUA; CUA1, CUA2) about the corresponding construction site (CS1, CS2) according to a location analysis.;Further, a method for cancelling a construction site area (CSA; CSA1, CSA2) in a central registration system (21) for a traffic infrastructure network (10), wherein a supervisor (SV) cancels (102) the construction site area within the central registration system (21) after all safeguard assistants (SGA) allocated to the corresponding construction site (CS1, CS2) have requested (110) or consented to (114) cancelling the construction site area, wherein at least one safeguard assistant (SGA) is allocated to said construction site, is characterized in that the central registration system (21) allows the cancelling (102) of the construction site area only if at least one of the safeguard assistants allocated to the construction site was, at the point of time of notifying his request (110) or consent (114), within a defined close-up area (CUA; CUA1, CUA2) about the respective construction site according to a location analysis.;The inventive methods make the establishing and cancelling of construction site areas safer.
展开▼