首页> 外国专利> METHOD FOR ESTIMATION OF LOAD CARRYING CAPACITY OF BRIDGES

METHOD FOR ESTIMATION OF LOAD CARRYING CAPACITY OF BRIDGES

机译:桥梁承载力的估算方法

摘要

PURPOSE: A trafficability calculation method of a bridge is provided to effectively prevent economical damages according to a traffic jam by effectively calculating the trafficability of the bridge. CONSTITUTION: A model parameter of a bridge is calculated by using acceleration signals acquired from an accelerometer installed on the bridge(S1,S2). An interpreted model of the bridge is updated by using the calculated model parameter(S3). First stress generated on the bridge is calculated by applying fixed weight to the interpreted model(S4a). Second stress generated on the bridge is calculated(S4b). The trafficability of the bridge is calculated by using the first stress and the second stress(S5).
机译:目的:提供一种桥梁的通行性计算方法,以通过有效地计算桥梁的通行性来有效地防止因交通拥堵而造成的经济损失。组成:桥梁的模型参数是通过使用从安装在桥梁(S1,S2)上的加速度计获得的加速度信号来计算的。通过使用计算出的模型参数来更新桥梁的解释模型(S3)。桥梁上产生的第一应力是通过对解释的模型施加固定的重量来计算的(S4a)。计算在桥梁上产生的第二应力(S4b)。通过使用第一应力和第二应力计算桥梁的通行能力(S5)。

著录项

  • 公开/公告号KR20120050704A

    专利类型

  • 公开/公告日2012-05-21

    原文格式PDF

  • 申请/专利权人 KOREA EXPRESSWAY CORP.;

    申请/专利号KR20100112095

  • 发明设计人 LEE CHANG GUEN;LEE WON TAE;LEE JONG JAE;

    申请日2010-11-11

  • 分类号G06Q50;G06F19;E01D22;

  • 国家 KR

  • 入库时间 2022-08-21 17:10:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号