首页> 外国专利> METHOD FOR OIL AND GAS WELLS INFRASTRUCTURE DEVELOPMENT IN INTERVAL OF PRODUCTION FORMATION BY ARTIFICIAL MEDIUM WITH FICTITIOUS POROUSNESS

METHOD FOR OIL AND GAS WELLS INFRASTRUCTURE DEVELOPMENT IN INTERVAL OF PRODUCTION FORMATION BY ARTIFICIAL MEDIUM WITH FICTITIOUS POROUSNESS

机译:虚假孔隙度的人工增产间隔中油气井基础设施发展的方法

摘要

FIELD: oil and gas production.;SUBSTANCE: in barefoot production interval of wellbore there installed is a shank with ready perforated holes inside of which there arranged is a block-type gravel-packed filter of necessary length. Blocks inner space contains porous medium that represents fictitious ground with cubical packing. Fictitious ground consists of detachable elements that represent spherical balls of equal size. The position of detachable elements is rigidly fixed inside the blocks and does not change during wells operation. Block-type filter of necessary length is assembled directly at site and descended to well bottom-hole.;EFFECT: increase of well productivity, reduction of drilling works volumes and cost, increase of service life and reliability of submersible gravel-packed filters.;22 dwg
机译:领域:石油和天然气生产;实质:在裸眼的井眼生产间隔中,安装了一个带有准备好打孔的柄,在该柄内安排了必要长度的块状砾石填充过滤器。块的内部空间包含多孔介质,该多孔介质以立方堆积表示虚拟地面。虚拟地面由可分离的元素组成,这些元素代表大小相等的球形球。可拆卸元件的位置牢固地固定在砌块内部,在油井作业期间不会改变。必要长度的块状过滤器直接在现场组装并下降到井底孔。效果:提高了井的生产率,减少了钻探工作量和成本,增加了潜水砾石充填过滤器的使用寿命和可靠性。 22载重吨

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号