首页> 外国专利> PROCESS TO OPTIMISE PRODUCTION OF AN UNDERGROUND ENVIRONMENT USING A RESERVOIR STUDY INCLUDING OPTIMISED SCALING

PROCESS TO OPTIMISE PRODUCTION OF AN UNDERGROUND ENVIRONMENT USING A RESERVOIR STUDY INCLUDING OPTIMISED SCALING

机译:使用包括最佳尺度的储层研究来优化地下环境的过程

摘要

- A method for optimizing overexploitation of a fluid reservoir through an accelerated reservoir study. - We construct a geological model. Then we built a reservoir model by a scaling of the geological model. and one backup is determined links between the mesh of the geological model and the cell of the reservoir model in which they are contained. Were performed flow simulations by means of a reservoir simulator, the reservoir model and links. Then these steps are repeated without repeating the step of determining links, changing settings of study reservoir so as to optimize the operating schedule. Finally, exploiting the deposit as this optimized development scheme.
机译:-通过加速油藏研究优化储集层过度开采的方法。 -我们建立了地质模型。然后,我们通过按比例缩放地质模型建立了一个储层模型。然后确定一个备份,以将地质模型的网格与包含它们的储层模型的单元之间的链接确定下来。通过油藏模拟器,油藏模型和链接进行了流动模拟。然后,重复这些步骤,而无需重复确定链接,更改研究储层设置的步骤,从而优化了作业时间表。最后,将矿床作为这种优化的开发方案。

著录项

  • 公开/公告号CA2796697A1

    专利类型

  • 公开/公告日2013-05-17

    原文格式PDF

  • 申请/专利权人 IFP ENERGIES NOUVELLES;

    申请/专利号CA20122796697

  • 发明设计人 PREUX CHRISTOPHE;LE RAVALEC MICKAELE;

    申请日2012-11-13

  • 分类号G01V9;E21B43;

  • 国家 CA

  • 入库时间 2022-08-21 16:38:03

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号