首页> 外国专利> TRENCHLESS TUNNEL CONSTRUCTION METHOD FOR PREVENTING SETTLEMENT OR DISTURBANCE OF GROUND DURING CONSTRUCTION OF AN UNDERGROUND TUNNEL

TRENCHLESS TUNNEL CONSTRUCTION METHOD FOR PREVENTING SETTLEMENT OR DISTURBANCE OF GROUND DURING CONSTRUCTION OF AN UNDERGROUND TUNNEL

机译:防止地下隧道施工过程中地面沉降或扰动的无洞隧道施工方法

摘要

PURPOSE: A trenchless tunnel construction method is provided to reduce construction period and costs for a tunnel by forming the tunnel under the ground after inserting a leading end structure.;CONSTITUTION: A trenchless tunnel construction method comprises the steps of: excavating both sides of a predetermined site to form a propulsion base and an arrival base, forming a tunnel structure(1) comprising a tunnel unit body(20) and a leading end structure(10), installing a plurality of forward pressure jacks in the propulsion base, pressing the tunnel structure into the ground using the forward pressure jack, pressing the leading end structure into the ground by driving of a hydraulic jack(18) to form a space for installation of the tunnel structure under the ground, and extending a tunnel outside wall(21) of the tunnel unit body to the space and fixing a reaction beam(22) to the front side of the extended tunnel outside wall.;COPYRIGHT KIPO 2013
机译:目的:提供一种非开挖隧道施工方法,通过在插入前端结构后在地下形成隧道来减少隧道的建设时间和成本。组成:非开挖隧道施工方法包括以下步骤:开挖隧道的两侧预定位置以形成推进基座和到达基座,形成包括隧道单元主体(20)和前端结构(10)的隧道结构(1),在推进基座中安装多个前压千斤顶,使用前推式千斤顶将隧道结构打入地下,通过驱动液压千斤顶(18)将前端结构压入地下,以形成将隧道结构安装在地下的空间,并延伸隧道外墙(21) ),将隧道单元主体固定到空间上,并将反应梁(22)固定在延伸的隧道外墙的前侧。; COPYRIGHT KIPO 2013

著录项

  • 公开/公告号KR20120127906A

    专利类型

  • 公开/公告日2012-11-26

    原文格式PDF

  • 申请/专利权人 WI JOON BOK;

    申请/专利号KR20110045686

  • 发明设计人 WI JOON BOK;

    申请日2011-05-16

  • 分类号E21D9/06;

  • 国家 KR

  • 入库时间 2022-08-21 16:28:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号