首页> 外国专利> DEVICE FOR OPERATING A TURBINE GENERATOR IN A STEAM POWER PLANT, WHICH COMPRISES TWO BOILERS AND ONE TURBINE UNIT IN CASE ONE BOILER IS INOPERABLE

DEVICE FOR OPERATING A TURBINE GENERATOR IN A STEAM POWER PLANT, WHICH COMPRISES TWO BOILERS AND ONE TURBINE UNIT IN CASE ONE BOILER IS INOPERABLE

机译:在一个锅炉无法运行的情况下,由两个锅炉和一个涡轮机组组成的蒸汽发电厂中运行涡轮发电机的设备

摘要

PURPOSE: A device for operating a turbine generator in a steam power plant is provided to be operated without a noticeable decrease of power by controlling the pressure of steam and reheat steam according to pressure changes.;CONSTITUTION: A device for operating a turbine generator in a steam power plant comprises a turbine unit(10), a water supply pump(30), a first boiler(40), a second boiler(50), a main control valve(60), an intercept valve(70), and a control unit(80). The main control valve is installed in first and fifth pipelines and controls the supply. The fifth pipeline supplies main steam supplied through the third pipeline to a high pressure steam turbine. The intercept valve is installed in second and sixth pipelines and controls the supply. The sixth pipeline supplies reheat steam supplied through a fourth pipeline to a middle pressure steam turbine. The control unit controls the control valve and intercept valve according to pressure changes of the main steam and reheat steam.;COPYRIGHT KIPO 2013;[Reference numerals] (80) Control unit
机译:目的:提供一种用于在蒸汽发电厂中操作涡轮发电机的装置,该装置可通过根据压力变化控制蒸汽压力和重新加热蒸汽来在不显着降低功率的情况下进行操作。一种蒸汽发电厂,包括涡轮机单元(10),供水泵(30),第一锅炉(40),第二锅炉(50),主控制阀(60),截流阀(70)和控制单元(80)。主控制阀安装在第一和第五条管道中,并控制供应。第五管道将通过第三管道供应的主蒸汽供应给高压蒸汽轮机。截流阀安装在第二和第六条管道中,并控制供应。第六管道将通过第四管道供应的再热蒸汽供应至中压蒸汽轮机。控制单元根据主蒸汽和再热蒸汽的压力变化控制控制阀和截流阀。; COPYRIGHT KIPO 2013; [参考数字](80)控制单元

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号