首页> 外国专利> METHOD FOR COOLING A GAS TURBINE AND A SUPPORT DEVICE, CAPABLE OF SMOOTHLY AND CONTINUOUSLY OPERATING THE GAS TURBINE AND THE SUPPORT DEVICE BY CHANGING A COOLANT SUPPLY LINE TO CONNECT AN UPPER DUCT LINE TO A LOWER DUCT LINE

METHOD FOR COOLING A GAS TURBINE AND A SUPPORT DEVICE, CAPABLE OF SMOOTHLY AND CONTINUOUSLY OPERATING THE GAS TURBINE AND THE SUPPORT DEVICE BY CHANGING A COOLANT SUPPLY LINE TO CONNECT AN UPPER DUCT LINE TO A LOWER DUCT LINE

机译:冷却燃气轮机和支持设备的方法,该方法可通过改变冷却液供应线以将上输气管连接到下输气管,从而连续且连续地操作燃气轮机和辅助设备

摘要

PURPOSE: A method for cooling a gas turbine and a support device is provided to smoothly and continuously operate the gas turbine and the support device by changing a supply line to prevent an area which does not satisfy the temperature standard of the gas turbine from being expanding.;CONSTITUTION: A method for cooling a gas turbine and support device is provided to cool a gas turbine and a support device by including upper and lower cooling devices. The upper and lower cooling devices independently operate in a normal operating state. When the lower cooling device does not satisfy a temperature standard, cold air supplied through the upper cooling device flows into the lower cooling device through a fluid path conversion unit. The fluid path conversion unit is an opening and closing valve. The fluid path conversion unit is an automatic or manual damper device.;COPYRIGHT KIPO 2013
机译:用途:提供了一种用于冷却燃气轮机的方法和支撑装置,以通过改变供应管线来平稳且连续地操作燃气轮机和支撑装置,以防止不满足燃气轮机温度标准的区域膨胀组成:提供了一种用于冷却燃气轮机和支撑装置的方法,以通过包括上冷却装置和下冷却装置来冷却燃气轮机和支撑装置。上下冷却装置独立地在正常操作状态下操作。当下部冷却装置不满足温度标准时,通过上部冷却装置供应的冷空气通过流体路径转换单元流入下部冷却装置。流体路径转换单元是开闭阀。流体路径转换单元是自动或手动阻尼器设备。; COPYRIGHT KIPO 2013

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号