首页> 外国专利> METHOD FOR APPLICATION OF SMALL WIND POWER SYSTEM IN SUPER HIGH-RISE BUILDING

METHOD FOR APPLICATION OF SMALL WIND POWER SYSTEM IN SUPER HIGH-RISE BUILDING

机译:小型风电系统在超高层建筑中的应用方法

摘要

PURPOSE: A method for applying a small wind power generation system to skyscrapers is provided to efficiently manage and reduce power consumption. CONSTITUTION: A method for applying a small wind power generation system to skyscrapers is as follows: an application possibility estimating step (ST1-ST3) for analyzing the climate of a target area where a target building is located and determining a wind environmental estimation method; a CFD step (ST4,ST5) for modeling the building and calculating probability distribution according to wind speed sections; a wind tunnel experiment step (ST6-ST8) for manufacturing a building model, measuring wind direction and speed, and calculating the probability distribution according to the wind speed sections; and an application step (ST9-ST13) for selecting an installation position, analyzing the electric energy of the building, setting the electric energy of the small wind power generation system, and calculating a proper separation distance when a small wind power generator is selected. [Reference numerals] (AA) Start; (BB) CRD interpretation; (CC) Wind tunnel experiment; (DD) End; (ST1) Determine a target building; (ST10) Analyze the amount of electricity of the target building; (ST11) Set the electric energy of a small wind power generation system; (ST12) Select a small wind power generator; (ST13) Calculate a proper separation distance; (ST2) Analyze the temperature of a target area; (ST3) Select a method for evaluating the wind environment of the target building; (ST4) Modeling the building; (ST5,ST8) Calculate probability distribution according to wind speed sections; (ST6) Manufacture a building model; (ST7) Measure wind direction and speed according to the locations of the target building; (ST9) Determine a set up location
机译:目的:提供一种将小型风力发电系统应用于摩天大楼的方法,以有效管理和减少功耗。构成:将小型风力发电系统应用于摩天大楼的方法如下:应用可能性估计步骤(ST1-ST3),用于分析目标建筑物所在目标区域的气候并确定风环境估计方法; CFD步骤(ST4,ST5),用于对建筑物进行建模并根据风速截面计算概率分布;风洞实验步骤(ST6-ST8),用于制造建筑模型,测量风向和风速,并根据风速区间计算概率分布;应用步骤(ST9-ST13),其用于选择安装位置,分析建筑物的电能,设定小型风力发电系统的电能,并在选择小型风力发电机时计算适当的间隔距离。 [参考数字](AA)开始; (BB)CRD解释; (CC)风洞实验; (DD)结束; (ST1)确定目标建筑物; (ST10)分析目标建筑物的电量; (ST11)设定小型风力发电系统的电能; (ST12)选择小型风力发电机; (ST13)计算适当的间隔距离; (ST2)分析目标区域的温度; (ST3)选择评价对象建筑物的风环境的方法。 (ST4)对建筑物建模; (ST5,ST8)根据风速区间计算概率分布; (ST6)制造建筑模型; (ST7)根据目标建筑物的位置测量风向和风速; (ST9)确定设置位置

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号