首页> 外国专利> METHOD FOR RECOVERY develop a career path for construction of cemeteries MUSEUM

METHOD FOR RECOVERY develop a career path for construction of cemeteries MUSEUM

机译:恢复方法为墓地的建设发展职业道路

摘要

Restoring method developed pits for construction cemetery museum comprising stowing to the boundary of the upper groundwater level construction waste, similar in composition to natural minerals of different particle size fractions in layers followed by consolidation of each layer, laying drainage layer construction waste, not thick less than 0.6 m and a grain size fraction of 150-200 mm, characterized in that initially in the goaf career define slits srednekamennougo Fat ceiling elements age for the Earth Museum devices, then make a bookmark with construction waste, keeping sediment sections, representing a geological monument of nature, free, with the ability to access, monitor them and devices including the Earth Museum, then the center of the quarry on the drainage layer dump overburden, thus forming hill after the height of the hill reaches the average of the absolute mark, produced hill terracing with a bulldozer, why produce first portion and a breakdown intertillage boro zd indicating the limits of future terraces, walkways and driveways, and then successively formed web each terrace, and the width of the web terraces should be at least seven meters, installed drainage system, retaining walls, and made of reinforced concrete cylindrical piles retaining walls for terraces by their immersion into the ground, the calculated depth, successively with the same pitch equal to five diameters of the pile, starting from the bottom tier of the terraces, the pile end walls rigidly connected with each other via
机译:恢复方法,为建筑公墓博物馆开发坑,包括将其堆积到上部地下水位建筑废料的边界,其组成类似于层中具有不同粒径分数的天然矿物,然后逐层固结,铺设排水层建筑废料,厚度不小于直径小于0.6 m,晶粒度分数为150-200 mm,其特征在于最初在采空作业中为Earth Museum设备定义了缝隙srednekamennougo Fat天花板元素,然后用建筑废料制成书签,保留沉积物部分,代表地质免费的自然纪念碑,具有访问,监视它们和包括地球博物馆在内的设备的能力,然后在排水层的采石场的中心倾覆覆盖层,从而在山高达到绝对标记的平均值后形成山,用推土机生产了山坡梯田,为什么要生产第一部分和细分耕作boro zd indi迎合未来梯田,人行道和行车道的限制,然后依次在每个梯田上形成腹板,腹板梯田的宽度应至少为7米,安装排水系统,挡土墙,并由钢筋混凝土圆柱桩挡土墙制成,用于梯田通过浸入地下,计算出的深度,以相同的间距等于桩的五个直径,从梯田的底层开始,桩端壁通过

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号