首页> 外国专利> Ways to open development of mineral deposits ESTABLISHMENT BLADE HIGH CAPACITY AND HEIGHT IN DIFFICULT CONDITIONS

Ways to open development of mineral deposits ESTABLISHMENT BLADE HIGH CAPACITY AND HEIGHT IN DIFFICULT CONDITIONS

机译:开放矿产资源开发的途径困难条件下的高容量和高身高刀片

摘要

FIELD: mining.;SUBSTANCE: invention relates to the method of open mining of mineral deposits with creation of a dump. The method includes separation of career space by zones, height and pit perimeter, cutting of ledges and horizons on which overburden and mining works with removal of rocks by truck or by rail into dumps and via ore chutes to reloading points are conducted, and dumps are built up using the cyclic action facilities. Meanwhile a convex form of a working edge is formed, gradually being fitted into the edge differentiated by steepness on a final contour which is built up in view of minimum disturbance of walls of slopes and a edge according to the technology with minimum consumption of explosives (E) with removal and dumping of rock into a main dump located near a zone of overburden works outside a contour of a steep edge of a pit of the 1st phase; initially temporary dumps are used with self-transportation of rocks outside a pit, and with their partial re excavation, provide the minimum shoulder of tramming of rocks and ore using the crushing reloading points and conveyors from inclined planes on the top horizons to the steep and vertical at completion of a pit. And with deepening of mining operations the overburden zone is divided into two sites and rock is moved by combined transport from two sides into a dump under construction parallel to a edge slope in view of deformation of its separate sites, and rock dumping on a dump after crushing is carried out by line transport facilities using the mobile console, the minimum shoulder of tramming of rock and ore and costs of development of mountain weight on the first and the subsequent stages (turns) are ensured, and the first two layers of a dump are dumped according to cyclic and line TsPT technologies using motor transport or loaders (at re-excavation of rocks) that provides stability and robustness of the dump front according the developed technology of dumping, at the final stage the third layer is dumped, and the fourth layer of dump if necessary, according to its calculated volume and height and limit depth of a pit.;EFFECT: improvement of efficiency of field development during construction of a dump with large volume and height at decrease of costs of stripping and improvement of safety of dumping.;4 dwg
机译:技术领域本发明涉及通过产生垃圾场来露天开采矿床的方法。该方法包括按区域,高度和矿坑周长划分职业空间,切割壁架和地层,在其上进行覆盖层和采矿工作,并通过卡车或铁路将岩石移至堆放场,并通过矿石溜槽到达再装填点,然后进行堆放。使用循环动作工具建立起来的同时形成凸形的工作边缘,并根据最小化炸药消耗的技术,将最终轮廓上的陡度逐渐渐渐地装配到最终轮廓上,该轮廓是根据最小的斜坡壁和边缘扰动而建立的( E)将岩石移出并倾倒至位于上覆岩层附近的主倾倒物,该倾倒物在第一阶段的坑的陡峭边缘的轮廓之外;最初,临时堆放场用于岩石在坑外的自我运输,并进行部分挖掘,使用破碎的装填点和输送机从顶部地平线的倾斜平面到陡峭的地面,将岩石和矿石的行进最小化。竖井完工后垂直。随着采矿作业的加深,上覆地带被划分为两个位置,并且由于岩石的分离位置的变形,岩石通过两侧的联合运输从两侧移入与边坡平行的正在施工的堆放场中,然后将岩石倒入一个堆放场中使用移动控制台通过线路运输设施进行破碎,确保在第一阶段和后续阶段(转弯)的最小的岩石和矿石踩踏和山体重量的开发成本,以及前两层垃圾堆根据TsPT循环技术和线TsPT技术,使用电机运输工具或装载机(在岩石重新开挖时)将其倾倒,该装载机根据已开发的倾倒技术提供倾倒锋面的稳定性和鲁棒性,最后阶段是倾倒第三层,根据需要,根据计算出的容积,高度和坑的极限深度,对第四层垃圾场进行处理;效果:提高施工期间现场开发的效率n具有大体积和高度的转储,减少了剥离成本并提高了转储的安全性; 4 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号