首页> 外国专利> DEVELOPMENT METHOD OF OIL DEPOSIT IN FRACTURED RESERVOIRS

DEVELOPMENT METHOD OF OIL DEPOSIT IN FRACTURED RESERVOIRS

机译:裂缝性油藏成藏方法

摘要

FIELD: oil and gas industry.;SUBSTANCE: method involves arrangement of production and injection wells, pumping of displacement liquid through injection wells and extraction of the product through production wells. The first injection well is developed for pumping of displacement liquid with development of interval of oil-water contact (OWC) of the formation. Extraction of the product is performed from production wells with developed oil-saturated intervals of the formation, which envelop it. At that cyclic pumping of displacement liquid is performed to the first injection well with 100-200% of compensation of product extraction from production wells enveloping it. Then, after flooding in fractures of one of production wells enveloping the first injection well, isolation of the open oil-saturated interval of the formation in the same well is performed with development in it of interval of OWC of the formation and with its being changed over to the second injection well for pumping of displacement liquid with 100-200% compensation of the product extraction from production wells enveloping it after flooding in fractures of one of the production wells enveloping it. After flooding in fractures of one of production wells enveloping the second injection well, isolation of the open oil-saturated interval of the formation in the same well is performed with development in it of interval of OWC of the formation and with its being changed over to the third injection well. Gradually, as fractures are being developed, a row of injection wells is created on the oil deposit, to which displacement liquid is pumped. Periodically polyacrylamide bank is pumped into the injection wells during stops in displacement liquid pumping. When products are flooded per more than 85% in each production well enveloping the injection well, open interval of OWC in this injection well is isolated and horizontal offshoots are drilled from it in the oil-saturated interval perpendicular to direction of fractures development and this well is transferred to product recovery.;EFFECT: prevention of early oil deposit watering and improvement in development of remaining oil stock.;3 ex, 4 dwg
机译:领域:石油和天然气工业。实质:方法涉及生产和注入井的布置,通过注入井泵送驱替液以及通过生产井提取产品。随着地层的油水接触(OWC)间隔的增加,开发了第一口注入井,用于泵送驱替液。产品从具有饱和油层的开采井中抽出,将其包裹起来。此时,将置换液循环泵送至第一个注入井,并从包围其的生产井中抽取100%至200%的产品萃取补偿。然后,在包围第一个注入井的一口生产井的裂缝中注满后,随着地层的OWC间隔的发展和变化,对同一井中地层的裸油饱和油层进行隔离。注入第二个注入井,以泵送驱替液,并补偿其中一个生产井的一口裂缝淹没后,从包围它的生产井中抽出产品的产品的100-200%补偿。在包围第二个注入井的一口生产井的裂缝中驱油后,随着该地层的OWC间隔的发展并转换为,将同一井中地层的裸油饱和油层隔离开来。第三口井。随着裂缝的逐渐发展,在油层上形成了一排注水井,将驱替液泵送到注水井中。在驱替液泵停止期间,定期将聚丙烯酰胺库泵入注入井。当每口生产井中超过85%的产品被注水井淹没时,该注水井中OWC的开放距离就会被隔离,并在垂直于裂缝发展方向和该井的油饱和油井中钻出水平分支。效果:防止早期油藏浇水并改善剩余油库的开发。; 3 ex,4 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号