首页>
外国专利>
Simulation device monitoring and control system comprehensive test method
Simulation device monitoring and control system comprehensive test method
展开▼
机译:仿真设备监控系统综合测试方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a total test method for a supervision control system, and a simulation device, which do not require purchasing or leasing of the entire open-network-compatible transmission terminals of a variety of manufacturers.;SOLUTION: The supervision control system total test method includes: a first step for registering electric amount items in the specifications of each open-network-compatible instrumentation device into simulation devices 8A, 8B, 8D; a second step for connecting the simulation devices to the total test system via an open network 5; a third step for arbitrarily modifying the electric amount items registered in the simulation devices; and a fourth step for outputting the arbitrarily modified electric amount items from the simulation devices to the open network. The modified electric amount items output from the simulation devices are collected through the open network, and based on the electric amount items, the total test of the supervision control system is carried out.;COPYRIGHT: (C)2012,JPO&INPIT
展开▼