首页> 外国专利> TASK SCHEDULING SCHEME USING INFORMATION BASED ON ESTIMATED EXECUTION TIME AND HETEROGENEOUS MULTI-CORE PROCESSOR SYSTEM USING THE SCHEME

TASK SCHEDULING SCHEME USING INFORMATION BASED ON ESTIMATED EXECUTION TIME AND HETEROGENEOUS MULTI-CORE PROCESSOR SYSTEM USING THE SCHEME

机译:使用基于估计执行时间的信息的任务调度方案以及使用该方案的异构多核处理器系统

摘要

The present invention relates to a kind of heterogeneous polynuclear heart processor system distributed tasks of task distribution method and heterogeneous polynuclear heart procedures system to utilize method. More specifically, the present invention relates to utilize method using the information and heterogeneous multi-core procedures system of estimation execution time in task distribution method heterogeneous polynuclear heart processor system distributed tasks, it can be improved task process performance and energy efficiency, pass through the execution time of distributed tasks, since by using assessment information, the execution time that remaining task is added is that the executing the time with estimation of the task executed at present by each processor is distributed. ;The 2014 of copyright KIPO submissions
机译:本发明涉及一种任务分配方法的异构多核心脏处理器系统分布式任务和利用该方法的异构多核心脏程序系统。更具体地,本发明涉及在任务分配方法,异构多核心脏处理器系统分配任务中利用信息和异构多核程序系统估计执行时间的方法,可以提高任务处理性能和能效,通过分布式任务的执行时间,由于通过使用评估信息,添加了剩余任务的执行时间是分配了每个处理器当前估计的正在执行的任务的执行时间。 ; 2014年版权KIPO提交文件

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号