The present invention relates to a construction method for middle and high-rise residential buildings using precast concrete frames and modular units. The method is for ensuring structural integrity and constructing each floor from downstairs to upstairs by assembling precast concrete panel members at the site, which are manufactured in a factory in advance, constructing a wall structure frame, installing completed modular units, and placing topping concrete when upper floors are being built. The construction method for middle and high-rise residential buildings using precast concrete frames and modular units according to an embodiment of the present invention comprises the following steps of: (S1) installing multiple precast concrete ground floor side wall bodies at a predetermined interval on a ground floor slab made of on-site placed concrete or precast concrete; (S2) installing a ground floor side modular unit made of finished goods between the ground floor side walls; (S3) installing a second floor slab made of precast concrete so that the both ends of a ground floor modular unit can be mounted on the top of the ground floor side wall; (S4) installing a ground floor rear wall made of the precast concrete between the ground floor slab and the second floor slab on the back of the ground floor modular unit; (S5) placing the topping concrete on the top of the second floor slab and completely constructing the ground floor; and (S6) repeating the steps from (S1) to (S5) until a planned floor is constructed.;COPYRIGHT KIPO 2014;[Reference numerals] (AA) Start; (BB) End; (S1) Step of installing side wall bodies on a ground floor slab; (S2) Step of installing a ground floor modular unit; (S3) Step of installing a second floor slab; (S4) Step of installing a ground floor rear wall body between the ground floor slab and the second floor slab; (S5) Step of placing the topping concrete on the top of the second floor slab and completely constructing the ground floor; (S6) Step of repeating the steps from (S1) to (S5) until a planned floor is constructed
展开▼