首页>
外国专利>
METHOD FOR DETERMINING THE VOLUME OF PERMITTED BUILDING WITH REGARD TO THE DURATION INSOLATION Architectural Design
METHOD FOR DETERMINING THE VOLUME OF PERMITTED BUILDING WITH REGARD TO THE DURATION INSOLATION Architectural Design
展开▼
机译:考虑持续时间的建筑确定建筑量的方法建筑设计
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for determining the allowable amount of development of the condition the duration of insolation in architectural design, comprising creating three-dimensional models of existing buildings and preliminary volume allocated for a new development, determining sectors beginning and end of insolation reference points, characterized in that the original single sectors source of insolation reference points to the construction of the new building, then define the minimum and sectors based on their radial volume, create a valid Duration awn insolation at such points, and by subtracting that amount from the pre-obtained volume allowable building construction, wherein the position of minimum insolation sectors within the original insolation sectors is optimized so as to provide the largest allowable building.
展开▼