摘要

Method predetermined rotational frequency control generator turbine power plant (gas turbine power plant), running in parallel with the network of high power, comprising the steps of: generating a predetermined generator turbine speed as a sum of rated speed mismatch between the desired and the actual load power multiplied by a factor of droop, wherein in that additionally to predetermined turbine speed deviation of the actual turbine added frequency from the nominal value.
机译:与高功率网络并联运行的方法预定转速控制发电机涡轮机电厂(燃气轮机电厂),包括以下步骤:生成预定发电机涡轮机转速,作为期望转速与实际转速之间额定转速不匹配的总和负载功率乘以一个下垂系数,其中,除了预定的涡轮速度之外,实际涡轮附加频率与标称值之间的偏差。