首页> 外国专利> INTEGRATED METHOD OF THE preliminary degassing of coal seams, the developed space and the formation of satellite and manage ROOF COLLAPSE OF SEVERE

INTEGRATED METHOD OF THE preliminary degassing of coal seams, the developed space and the formation of satellite and manage ROOF COLLAPSE OF SEVERE

机译:煤层初步除气,发达空间和卫星形成及严重屋顶塌陷综合治理方法

摘要

An integrated process for pre-degassing working coal seam gob and layers satellites and controlled caving heavy roof comprising conducting field preparatory drifts / incline, drilling fan wells into the soil and roof formation of special reservoir workings, as well as the long holes toward the goaf formation of advanced generation, smooth landing of the roof due to safety zhestkopodatlivyh pillars, for the implementation of advanced torpedo with cracks of the building; characterized complexity measures: wells are common for both degassing and for the torpedo, the creation of safe zhestkopodatlivyh pillars promotes directional collapse console and includes the risk of failure torpedo, the location of the torpedo-degassing wells provides longitudinal and lateral collapse hanging console when reaching its ultimate length; and in that the degassing of the roof takes place through the borehole, both before and after the torpedo at the top.
机译:预脱气工作煤层和层状卫星以及受控放顶重型顶棚的综合过程,包括进行现场准备漂移/倾斜,将扇形井钻入特殊储层工作的土壤和顶板,以及通往采空区的长孔形成先进的一代,由于安全zhestkopodatlivyh支柱而使屋顶顺利着陆,以实施带有建筑物裂缝的先进鱼雷;特点复杂的措施:井既用于脱气又用于鱼雷,安全的zhestkopodatlivyh支柱的创建促进了定向塌陷控制台,包括鱼雷失效的风险,鱼雷脱气井的位置在到达时提供了纵向和横向塌陷悬挂控制台最终长度;而且,在顶部鱼雷之前和之后,都通过钻孔对屋顶进行脱气。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号