CRANE MANUFACTURING METHOD AND UPPER FRAME SYSTEM OF CRANE UPPER FRAME STRUCTURE

机译:起重机上部框架结构的制造方法和上部框架系统

摘要

PROBLEM TO BE SOLVED: To provide a crane manufacturing method which enables a hoisting height of an upper frame structure of each upper frame device to be detected precisely and constantly when the upper frame structure is to be mounted with a plurality of upper frame devices, and which can prevent an excessive force from being applied on the upper frame structure, and an upper frame system for the crane manufacturing method.;SOLUTION: Take-up amounts L1-L4 of a wire rope 35 which a take-up device 36 has taken up are calculated from numbers of revolution ω1-ω4 of a fixed pulley 32A of each upper frame device 31A-31D. Each hoisting height h1-h4 of an upper frame structure 20 which each upper frame device 31A-31D has hoisted is calculated from the take-up amounts L1-L4 and tying numbers n1-n4 of the wire rope 35 wound around a combination pulley 34, and take-up speeds v1-v4 of each take-up device 36 are controlled by feedback so that differences between the hoisting heights h1-h4 may be minimized.;COPYRIGHT: (C)2016,JPO&INPIT
机译:解决的问题:提供一种起重机制造方法,当在上部框架结构上安装多个上部框架装置时,该起重机制造方法能够精确且恒定地检测每个上部框架装置的上部框架结构的提升高度,以及可以防止在上框架结构和起重机制造方法的上框架系统上施加过大的力。解决方案:收紧装置36收紧的钢丝绳35的收紧量L1-L4根据每个上框架装置31A-31D的固定滑轮32A的转数ω1-ω4来计算up。根据卷取量L1-L4和缠绕在组合滑轮34上的钢丝绳35的捆扎数n1-n4,计算出各上框架装置31A-31D所悬挂的上框架结构20的各升降高度h1-h4。 ;并且每个卷取装置36的卷取速度v1-v4通过反馈进行控制,以使提升高度h1-h4之间的差异最小。版权所有:(C)2016,JPO&INPIT

著录项

  • 公开/公告号JP2015196561A

    专利类型

  • 公开/公告日2015-11-09

    原文格式PDF

  • 申请/专利权人 MITSUI ENG & SHIPBUILD CO LTD;

    申请/专利号JP20140074533

  • 发明设计人 OGASAWARA MASANOBU;

    申请日2014-03-31

  • 分类号B66C19/00;

  • 国家 JP