首页>
外国专利>
Construction method of hydraulic solidifying material liquid replacement pile construction for sediment fall prevention device and the hydraulic solidifying material liquid replacement pile
Construction method of hydraulic solidifying material liquid replacement pile construction for sediment fall prevention device and the hydraulic solidifying material liquid replacement pile
展开▼
机译:防止沉淀物沉降的水硬性凝固材料液置换桩的施工方法及水硬性凝固材料液置换桩
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a soil fall prevention device for constructing a hydraulic-setting solidifying liquid substitution pile, which prevents soil and/or clods from collapsing into a substitution pile (hydraulic-setting solidifying liquid) immediately after completion of placing the hydraulic-setting solidifying liquid substitution pile and while the hydraulic-setting solidifying liquid has not hardened yet.;SOLUTION: A soil fall prevention device for constructing a hydraulic-setting solidifying liquid substitution pile has a funnel-like shape, of which the upside is an inverted pyramid-shaped part with a relatively blunt angle while the downside is an inverted pyramid-shaped-cylindrical part with a relatively sharp angle. The device is split at least into two sections in the axial direction. The split sections are connected with each other by hinges to be openable and closable, and the opening/closing end sides can be joined to each other to be fixed with fixtures.;COPYRIGHT: (C)2012,JPO&INPIT
展开▼